After the Rain by Total Environment, Yelahanka: A Villa Buyer's Guide

Bettahalasuru, a village on Sir MVIT College Road by Yelahanka, is the site of Total Environment After the Rain. This North Bangalore villa project is delivered phase by phase, each under a different Karnataka RERA number, and its earliest phases are occupied. Location, developer, villa plans, phase dates, costs and a checklist follow.
Reaching the Project
The campus is about 2.3 km off Bellary Road (NH 44), via Sir MVIT College Road at Bettahalasuru. Yelahanka is the large neighbourhood nearest to it. The highway reaches Kempegowda International Airport after a brief drive north, and Hebbal and then the Outer Ring Road to the south.
Along Bellary Road, the metro line to the airport is under construction. For most working families, long daily trips to the east or south of Bangalore weigh more than quick airport access.
Overview
The design is a campus of mixed use, with a clubhouse, villas and a block for commercial use. Its essentials are:
- Built by: Total Environment Building Systems Private Limited
- Campus: around 57 acres
- Location: Bettahalasuru Village (Jala Hobli) in Bangalore North Taluk, 562157
- Home types: duplex villas, 4 BHK and 3 BHK
- Villas: 333 planned, 281 registered so far in five residential phases
- Prices: on request
About Total Environment
Total Environment is a firm from Bangalore recognised for design-led houses with planted terraces, natural stone and exposed brick. Heavy customisation is much of the appeal. It also takes time, as the extensions granted to earlier phases make clear.
Villa Layouts
The villas carry plan names: V30, V50 and, from Phase III, a mid-sized V45. These three layouts feature on our project listing:
- The 3 BHK villa, at 4,824 sq ft
- V30 with 4 BHK, at 3,184 sq ft
- V50 with 4 BHK, at 5,120 sq ft
A V30 has a registered carpet area near 2,640 sq ft, and a V50 near 4,060 sq ft. Phase III villas split evenly, 18 being 3 BHK and 18 being 4 BHK. Homes are partly below ground, with roof gardens and living spaces opening to a courtyard.
Pricing is on request and changes with finish, plot and plan. As quotes differ widely, request through us the cost sheet that the developer issues for the exact villa.
Phase-Wise RERA Details
RERA treats each phase as its own project, and the phase of a villa sets the date binding the developer. All six registrations are tabled.
| RERA number | Phase | Completion date | Homes |
|---|---|---|---|
| PRM/KA/RERA/1251/309/PR/171014/000483 | Phase 1 | Extended to 30 April 2022 | 96 |
| PRM/KA/RERA/1251/309/PR/180519/001763 | Phase II A | Extended to 30 September 2024 | 86 |
| PRM/KA/RERA/1251/309/PR/191015/002923 | Phase II B | Extended to 1 August 2026 | 37 |
| PRM/KA/RERA/1251/309/PR/300322/004795 | Phase II C | 1 April 2028 | 26 |
| PRM/KA/RERA/1251/309/PR/160825/008002 | Phase III | 30 April 2032 | 36 |
| PRM/KA/RERA/1251/309/PR/110522/004867 | Commercial block | 1 May 2028 | Commercial |
Phases 1, II A and II B overshot their registered completion dates and were extended. Phase 1 had June 2019 as its first due date and 30 April 2022 as its last. Phase III is the latest, registered 16 August 2025 with 36 villas on around 7.7 acres.
Total Outlay
A villa this size attracts sizeable statutory charges beyond its price:
- GST at 5% for a villa still under construction
- Stamp duty, 5.6% overall once cess and surcharge join the 5% rate, when the home exceeds Rs. 45 Lakhs
- A registration fee equal to 2% of property value
- Any customisation costs, plus clubhouse charges and a maintenance deposit
- Legal fees for checking title and drafting the sale deed
A completed villa that has its occupancy certificate attracts no GST. Ask for the present monthly maintenance, which funds the clubhouse, landscape and common roads.
Who Should Consider It
Families after a spacious house led by design, on the city's airport side, are the right audience. Planted roofs with a central courtyard set these duplex villas apart from any regular gated layout. Budget and upkeep are both considerable, as the smallest format is over 3,000 sq ft.
Those who must move in within a year on a firm date should consider the completed phases or a resale villa. A fresh booking in the newest phase completes years ahead.
Shared Facilities
Amenities centre on a large clubhouse and parks between villa clusters:
- Café, retail spaces
- Gymnasium, swimming pool
- Spa, sauna
- Jogging track, outdoor courts
- Games room, party area
- Landscaped gardens, children's play area
Some shared facilities are linked to the commercial block and to later phases. Find out which already operate and which arrive with phases under construction.
Booking Checklist
Careful paperwork pays in a project built in phases. Go through these points:
- Identify the villa's phase and verify the RERA number with Karnataka RERA online
- Match the agreement's completion date to the phase's registered date
- Obtain the occupancy certificate if the villa is finished
- Visit after rain to see the roof garden, drainage and daylight in lower rooms
- Get a cost sheet listing base price, customisation and all charges separately
- Enquire about dates for the commercial block and the clubhouse
After the Rain villas are offered in the latest phase and on resale around the airport side of North Bangalore. Contact us for present availability and to plan a site visit.



