Aditri Tulips Plotted Layout, Chikkadasarahalli: Sarjapura Buyer's Guide (October 2026)

Plot buyers looking past Sarjapur town now have Aditri Tulips to consider, a 91-site residential layout in Chikkadasarahalli Village. The village belongs to Anekal Taluk's Sarjapura Hobli, in South East Bangalore. Karnataka RERA gave its approval on 29 September 2026, with the layout due for completion by 15 December 2027. Below are the site mix, approvals, an older namesake, the total cost and the papers to check.
Registered Details in Brief
These particulars appear in the registration on the state RERA portal:
- Promoter: Aditri Tulips, a partnership firm
- Survey numbers: 46/4, 46/2 and 47/2 of Chikkadasarahalli
- Total land: about 4.97 acres, or 20,133 sq m
- Residential plots: 91
- Planning approval: Anekal Planning Authority, 31 October 2025, reference ADA/LAO/39/2025-26
- Development start: 15 December 2025; scheduled finish: 15 December 2027
- Registered as: PRM/KA/RERA/1251/308/PR/290926/008977
How the Sites Are Divided
Most sites follow the two sizes Bangalore house plans are drawn for:
- 34 plots measuring 30x50 ft, or 1,500 sq ft
- 26 plots measuring 30x40 ft, or 1,200 sq ft
- 31 odd-sized plots, the smallest 727 sq ft and the largest 1,964 sq ft
Regular sites form roughly two-thirds of the layout, and they are easier to design a home for, borrow against and sell later. With an irregular or smaller site, setbacks eat into the buildable area. Request the plot schedule and confirm the dimensions of the exact site on offer.
Plots account for 11,036 sq m, just over half the land. Internal roads use 5,852 sq m, a civic amenity site is given 1,009 sq m, and parks with open spaces take 2,236 sq m. Each road is 9 m wide, and the water supply combines borewells with the local panchayat.
Beware the Older Namesake
An earlier Aditri Tulips exists in the same village, and listings frequently confuse the two. The earlier one was promoted by Aditri Projects LLP on Survey No. 63, with 101 plots approved by BMRDA. Its RERA registration, PRM/KA/RERA/1251/308/PR/181022/002085, dates from 22 October 2018, and completion was due on 26 January 2020.
The current one, from the partnership firm, has 91 plots on the three survey numbers listed above, under an Anekal Planning Authority approval. It was registered in September 2026, and completion is due in December 2027.
Most resale offers carrying this name relate to the Survey No. 63 layout. The firm behind the current layout shows no previous project in its K-RERA filing. Booking papers should therefore quote all three new survey numbers and the 2026 registration.
Land Title and the Joint Development Model
Buyers can confirm the registration online and download both the sanctioned plan and the list of plots. When it was registered, the layout had 21% of its development work done.
The promoter holds the land through registered joint development agreements signed with the owners. Residential conversion of the land was ordered by the Deputy Commissioner. Since a JDA divides the plots between owners and promoter, find out which side may sell the plot chosen and who will sign its sale deed.
Location and Daily Travel
Chikkadasarahalli is further out than Sarjapur town, towards Anekal, in the outer stretch of the Sarjapura belt and away from the Sarjapur Road office cluster. Land is cheaper than nearer the Outer Ring Road, but commutes to tech parks run longer.
Construction of the Satellite Town Ring Road is proceeding stage by stage around Bangalore's edge, and its route crosses the Anekal Taluk area near the village. Hospitals, schools and markets are mostly around Sarjapur town and farther along Sarjapur Road. A peak-hour drive from the layout to one's office is the most useful test.
Budgeting Beyond the Plot Price
Prices for Aditri Tulips are available on request. Check the rate per sq ft against the guidance value and against recent sale deeds in Chikkadasarahalli, and budget for:
- Karnataka stamp duty above Rs. 45 Lakhs: a base 5%, or 5.6% in all once cess and surcharge are added
- Registration charges at 2% of the value
- Any clubhouse, maintenance or development charge on the cost sheet
- Legal charges for checking title and drafting the sale deed
Duty is worked out on whichever is greater, the guidance value or the agreed price. Building the house later often costs more than the plot, and banks usually finance a lower share of value on plot loans than on home loans.
Who Should Consider It
The layout fits someone wanting a 30x40 or 30x50 plot to build on in the outer Sarjapura area. At about 5 acres it is compact, with layout approval and RERA registration already secured. A buyer here should accept waiting until roads, drains and electricity are in place.
As the promoter is new, the case for buying rests on documents, not on a known name. Buyers who prefer a finished layout with occupied homes have a wider choice around Sarjapur town and Sarjapur Road.
Paperwork to Check First
With a first-time promoter, check every document:
- Confirm on the K-RERA portal that the registration number and promoter match
- Ensure every paper refers to Survey Nos. 46/4, 46/2 and 47/2 rather than Survey No. 63
- Examine the sanction from the Anekal Planning Authority along with the plan it approved
- Read the JDA and conversion order for the plot's own survey number
- Obtain a legal title opinion for that particular site
- Inspect roads, drainage and power work on the ground against the timeline
- Pay only into the designated RERA account for the project
Paying in step with layout progress is safer than handing over a big advance. To compare this with other plotted projects across East Bangalore and the Sarjapura belt, ask the developer for details.