A Buyer's Guide to Total Environment ATR Workcations near Yelahanka (October 2026)

Along Sir MVIT College Road near Yelahanka, North Bangalore, Total Environment is developing a commercial office project, Total Environment ATR Workcations. One building with nine office floors adjoins After the Rain, a residential project. Office units of around 500 sq ft are available from Rs. 36 Lakhs upwards.
Where It Is and How to Reach It
The address is Sir MVIT College Road, Survey No. 355, in Bettahalasuru village of Jala Hobli, pincode 562157, Bangalore North Taluk. The approach is off Bellary Road (NH 44), heading north from Yelahanka towards the airport. The Bangalore Development Authority gave building plan approval, dated 13 April 2022.
On Bellary Road, Kempegowda International Airport is one way and Hebbal the other. The airport metro, the Blue Line, is under construction beside this highway, so travel is by road alone until it opens. After the Rain, the same developer's residential phases, is next door, which means a community of residents right beside it.
Is It the Right Fit?
It works for investors wanting a small commercial asset from a known developer. Consultants and small firms seeking an airport-side office address also fit. The attraction is an entry price well under that of a whole office floor.
As a commercial building it is the wrong choice for a home seeker. Since offices are given as bare shells, it also does not serve anyone needing a furnished office straight away. Reselling a small office share is slower than reselling a flat, so use money that can stay invested some years.
RERA Registration and Stage of Work
The registered name is After the Rain Commercial, and PRM/KA/RERA/1251/309/PR/110522/004867 is the number the Karnataka RERA authority issued on 11 May 2022. Total Environment Building Systems Private Limited is named as the promoter. The construction period on the registration starts 1 May 2022 and closes 1 May 2028.
Quarterly updates filed in 2026 show construction still in progress. A search of the Karnataka RERA website should use "After the Rain Commercial", as the marketing name is different. Ask to see the occupancy certificate ahead of possession or any lease.
The Building and Its Units
The master plan area is 15,622 sq m, about 3.86 acres, of which the building covers close to a third. A single tower of about 43 m has nine upper floors over a ground floor and three basements. Parking for 773 cars is split between the open yard and the basements.
Its registration shows 38 units:
| Unit | Number | Where |
|---|---|---|
| Office space | 36 | Nine upper floors, four per floor |
| Retail unit | One | Ground level |
| Hospitality unit | One | Ground level |
An office has between 3,590 sq ft and 14,430 sq ft of carpet area, both approximate. True to the developer's style, each floor gets a terrace garden and a floor height of 4 m at least. Outer walls combine other masonry with exposed wire-cut brick. Handover is bare, with flooring limited to the marble lobby, and with plumbing brought only to the shaft on every floor.
Buying a Unit of Around 500 sq ft
Units on offer are close to 500 sq ft, whereas no registered office space has less than roughly 3,590 sq ft of carpet area. Such a purchase is thus a share in a larger registered space. Check that the sale papers identify the office space concerned and the method of measuring the share.
These units are usually run as a group, with a single party in charge of upkeep and letting. An assured lease, a lock-in period or a rent figure has value only when written into the agreement. Insist on paper for lease terms, the escalation of rent and the position once the first lease period ends.
What It Costs
For a unit close to 500 sq ft the price begins with Rs. 36 Lakhs, or close to Rs. 7,200 for each sq ft. Ask us about the unit sizes open now and for the newest price list. Costs on top of the price, now or shortly after, are:
- The office fit-out, because handover is as a bare shell
- Commercial-rate property tax and monthly maintenance
- Registration and stamp duty at Karnataka's rates
- GST charged on agreement value, unless the price sheet already includes it
Bank loans against commercial property do not follow home loan terms, so have the loan share, tenure and rate confirmed in writing. The owner pays income tax on office rent. Let a chartered accountant check what the net return is after all these costs.
Who Is Behind the Project
Total Environment is based in Bangalore and has a name for homes led by design, with planted terraces and brick left exposed. It has delivered 6 million sq ft and more, to 1,600-plus customers across Pune, Bangalore, Frisco (Texas) and Hyderabad. The After the Rain phases beside this building are a guide to its finish and upkeep.
Pre-Booking Checklist
Part-ownership of an office floor needs more careful reading than a flat does:
- Link the unit to one registered office space and learn how the sale deed words the share of 500 sq ft
- Go through lock-in, exit and escalation in the agreement's terms of lease or rent
- Learn who manages upkeep and letting, and the position on a vacant floor
- Obtain a cost sheet with separate lines for GST, fit-out, registration and maintenance
- See that the completion date written in the agreement agrees with 1 May 2028, the registered date
- Have the title deeds and commercial plan approval read by a lawyer
- Route payments only to the project account that the RERA registration names
What is open changes floor by floor with bookings. Ask us for ATR Workcations units still open and for more commercial and residential projects of North Bangalore.



