Book A HomeReal Estate Advisory

Plots at Sobha Sacred Grove, Chikka Tirupathi: Sizes, Price and Checks (October 2026)

By Book A Home Editorial Team·20 November 2026·5 min read
Sobha Sacred Grove Plots plots

East of Sarjapur, where Bangalore's outskirts end, Sobha Limited has launched a gated plotted development called Sobha Sacred Grove. Earlier referred to as Sobha Chikka Tirupathi, it is registered as Sacred Grove By The Lake. Location, RERA status, buyer fit, plot dimensions, amenities, price and checks follow.

Where Chikka Tirupathi Is

On paper the address reads Kolar district, Malur taluk, Lakkur hobli, Chikkathirupathi village, Karnataka 563160. A Venkateshwara temple has made the village well known, and the approach from Bangalore is via Sarjapur town. Because the land is outside Bengaluru Urban district, plan approval came from Malur Planning Authority.

Road access works like this:

  • Sarjapur town, and Sarjapur Road beyond it, by the Sarjapur-Chikka Tirupathi Road
  • Hoskote, then Old Madras Road, by the road going north
  • Bangalore's Satellite Town Ring Road, or STRR, which is coming up in sections near the village

Two things drive growth in this belt: the STRR and the outward spread of housing from Sarjapur. Since both need time, a plot is a purchase for the medium to long term. Read more on our Chikka Tirupathi locality page.

Registration and Current Stage

The Karnataka RERA number is PRM/KA/RERA/1265/347/PR/020226/008445, issued 2 February 2026. Records name Iustus Residential Layout Private Limited as promoter and give 30 September 2028 for completion. Anyone can look it up through the Karnataka RERA portal by entering Sacred Grove By The Lake.

With development under way since February 2026, the coming two years will see roads, parks and drains built. Plots are due for possession in September 2028. The portal's quarterly updates tell you how far the layout work has got.

Buyers It Works For

Buyers keen to own land inside a gated, managed layout and design their own house are well matched. So are long-term holders who can wait several years while the neighbourhood matures. The owner also decides the timing and manner of building.

Today there are few schools, offices and hospitals near Chikka Tirupathi, as it is an outlying area. If the family must move in soon or needs a short trip to the tech corridors each day, a ready apartment nearer town serves better.

Plot Sizes and Land Use

Across 26.14 acres, the master plan lays out 388 residential plots. Plots occupy close to 55% of the site; civic amenity sites, parks and roads take the remainder. Parks and open spaces number 18, together about 2.7 acres.

The majority of plots have a 30 ft width. As per the registered schedule:

  • 1,500 sq ft plots measuring 30 x 50 ft: 157
  • 1,200 sq ft plots measuring 30 x 40 ft: 60
  • 1,650 sq ft plots measuring 30 x 55 ft: 52
  • 40 x 60, 30 x 60 or 30 x 45 ft plots: 16 altogether
  • Other sizes and odd shapes: 103

Density is close to 15 plots to the acre. An odd-shaped plot could be smaller or larger than standard, so read its precise dimensions off the layout plan.

Features Planned

The amenity plan exceeds what plotted layouts usually offer:

  • A Miyawaki forest of 10,000 trees
  • The Padukone School of Badminton as partner for a sports academy
  • A clubhouse with an indoor sports arena, multi-purpose hall, gymnasium, cafe and swimming pool
  • Courts for outdoor sports
  • Dedicated commercial spaces in the layout itself

Plot owners jointly pay for maintaining these facilities, which also lift the layout's appeal. Check what maintenance charge to expect and the duration of the developer's management.

Pricing and Extra Costs

Rs. 86 Lakhs is the starting price (June 2026). Price climbs with plot size, and park-facing or corner plots tend to cost extra. We can share an up-to-date price list by size.

Further costs to add:

  • Stamp duty, 5% above a Rs. 45 Lakhs value and 5.6% once cess and surcharge are included
  • 2% as registration fee
  • Cost sheet charges for infrastructure, clubhouse and maintenance
  • The later cost of constructing a house, which the plot purchase does not include

Lenders treat plots differently from homes, often financing a lower share of value and insisting on construction within a few years. Settle these terms with the bank before finalising a budget. For any loan amount, the EMI calculator returns the monthly instalment.

Checks to Run First

Since a plot purchase is a land deal, documents outweigh the brochure. Go over these:

  • The approved layout plan, for the plot's number, area and dimensions
  • The portal record, matched against the RERA number printed in the agreement
  • A lawyer's review of the title documents and land conversion order
  • Setbacks, floor count and the period given for starting to build
  • How water and power reach each plot
  • The drive to schools and the office from the site, at usual hours

Our Sobha Limited page covers the developer's record in the city. Tour the site and Sarjapur town to judge the area's development and everyday living.

Frequently Asked Questions

Is Sobha Sacred Grove registered under RERA?+
Yes. Its Karnataka RERA number, PRM/KA/RERA/1265/347/PR/020226/008445, was issued on 2 February 2026, and the registered title is Sacred Grove By The Lake. 30 September 2028 is the completion date.
What do plots at Sobha Sacred Grove cost?+
The June 2026 starting price is Rs. 86 Lakhs. Buyers also pay stamp duty, 2% towards registration and the charges set out in the cost sheet.
What are the plot dimensions at Sobha Sacred Grove?+
Of 388 plots, 269 are 30 x 40 ft, 30 x 55 ft and 30 x 50 ft sizes. The others are a handful of 40 x 60, 30 x 60 or 30 x 45 ft plots plus odd-shaped ones.
Where exactly is Sobha Sacred Grove?+
In Kolar district, within Malur taluk and Lakkur hobli, at Chikkathirupathi village, 563160. Buyers drive from Bangalore via Sarjapur town, with the upcoming Satellite Town Ring Road close to the village.
When will Sobha Sacred Grove plots be handed over?+
In September 2028. Development of the layout started in February 2026, and the RERA completion date falls on 30 September 2028.

Related Reads