Sobha One World at Hoskote: Prices, Phases and Buyer Checks (October 2026)

Buyers who heard of Sobha Hoskote or Sobha World City before launch will now find the same project named Sobha One World. Sobha Limited's new launch is an apartment township on 48 acres beside Old Madras Road at Hoskote, East Bangalore, and each of its six phases has held a Karnataka RERA number since 8 May 2026. Prices come first below, then phases, location and checks.
Homes and Starting Prices
The seven-plan price list opens with a 1 BHK (Rs. 1.12 Crore), while the largest 4 BHK tops it (Rs. 3.86 Crore).
| Plan | Starting price | Size in sq ft |
|---|---|---|
| 1 BHK | Rs. 1.12 Crore | 734 |
| 2 BHK Lux | Rs. 1.63 Crore | 1,063 |
| 2 BHK Grande | Rs. 1.85 Crore | 1,204 |
| 3 BHK Lux | Rs. 2.34 Crore | 1,510 |
| 3 BHK Grande | Rs. 2.81 Crore | 1,735 |
| 4 BHK Luxe | Rs. 3.33 Crore | 2,096 |
| 4 BHK Grande | Rs. 3.86 Crore | 2,415 |
Per sq ft, the 1 BHK is near Rs. 15,300 and the biggest 4 BHK near Rs. 16,000. Of 3,484 apartments, 2,146 have three bedrooms, 714 two, 356 four and 268 one.
Carpet area is below the sizes listed: close to 433 sq ft for the 1 BHK, 743 or 648 sq ft for the 2 BHK, and 1,100 or 960 sq ft for the bulk of the 3 BHK homes. Home types differ a little by wing, so request the specific home's carpet area.
An under-construction home carries these costs over its starting price:
- GST on the agreed value
- Registration at 2% and Karnataka stamp duty, which above Rs. 45 Lakhs is 5% with cess and surcharge on top
- Facing and floor-rise premiums, which count for a lot across 46 floors
- The maintenance deposit, clubhouse membership and car parking
Take the Rs. 1.12 Crore 1 BHK: stamp duty and registration add up to around Rs. 8.5 Lakhs. The EMI calculator gives the monthly payment.
Wings and Open Space
One Residences at Sobha One World is the name of the registered part. Its 14 wings contain 3,484 apartments, and a wing goes up 46 or 47 floors from three basements. With 265 to 271 homes in a full wing, a floor has around six.
That is nearly 73 homes to the acre. Buildings take up about one quarter of the land registered, leaving three quarters open. Amenities take in a clubhouse, sports courts, swimming pools, wellness gardens and a 90-metre diameter cricket ground.
Six Phases, Dates and RERA Numbers
Each phase has its own date. In order of completion:
- 31 July 2032: Phase 1, 542 homes in Wings 1, 2
- 31 August 2032: Phase 6, 721 homes in Wings 12, 13, 14
- 30 November 2032: Phase 2, 530 homes in Wings 3, 4
- 28 February 2033: Phase 5, 721 homes in Wings 9, 10, 11
- 30 September 2033: Phases 3 and 4, with 530 homes in Wings 5, 6 and 440 homes in Wings 7, 8
Karnataka RERA has approved the project under six numbers dated 8 May 2026, one to a phase. The first is PRM/KA/RERA/1250/304/PR/080526/008634 and the last is PRM/KA/RERA/1250/304/PR/080526/008639. The Satellite Town Ring Road Planning Authority cleared the building plan on 7 May 2026.
Registered construction starts from June to October 2026, according to phase. The number protecting a buyer is that of the phase in which the chosen wing falls. Both it and the matching completion date belong in the agreement for sale.
Location and Access
The site is at Amanidoddakere, a village of Kasaba Hobli in Hoskote Taluk of Bengaluru Rural district; its pincode is 562114. It runs beside Old Madras Road , which is NH 75 here, on a stretch marketed as Greater Whitefield. West of it are Budigere Cross, then KR Puram, and to its east is Hoskote town.
Large land parcels are being released around Hoskote, turning this industrial and logistics town into a housing market. The town is passed by the Satellite Town Ring Road and is near the start of the Bangalore-Chennai Expressway. Everyday shopping is done in Hoskote town, whereas larger hospitals, malls and schools mean a trip to Whitefield or Old Madras Road.
For any household, the work commute settles whether this address suits. Test the round trip to the office on two weekdays, in peak traffic, before booking.
Who Should Consider It
Sobha One World is for buyers after a big gated community with shops, a clubhouse and sports grounds inside it, and with time to wait. Handover begins with the first wings in mid-2032 and ends in September 2033. It suits those working in the Hoskote industrial belt, KR Puram or Whitefield.
The choice runs from a 1 BHK, right for a rental buyer or a professional living alone, up to a 4 BHK sized for a big family. The fit is weaker for buyers who cannot wait beyond two or three years, and for those wanting a small building where neighbours are few.
The Builder
Sobha Limited, a listed real estate company from Bangalore, dates from 1995. It designs and builds with in-house teams and workshops. Visit a finished East Bangalore community of the builder to judge finish and upkeep some years on.
Booking Checks
The wait is six to seven years, so a careful start matters. Cover these points:
- Check the wing's phase, completion date and RERA number with the RERA portal
- Request the specific home's plan and carpet area, and ask what Grande adds over Lux besides size
- Ask for the lift count in a wing that has 265 to 271 homes
- Study the sanctioned plan for the wing's position against the cricket ground, the main road and the clubhouse
- Ask about water, with the local panchayat and borewells as planned sources
- Ask how the site sheds rainwater, and go there following heavy rain if possible
- Take a cost sheet in full, with premiums, GST, maintenance and parking itemised
- Pay solely into the project account named by the RERA registration, and file every receipt
Open homes change with each booking. Contact us for the current price sheet and availability by wing and floor.



