A Buyer's Guide to Shriram Esquire in Koramangala 1st Block (October 2026)

Shriram Properties is building Shriram Esquire in South Bangalore, in the 1st Block of Koramangala. It is compact: two low-rise towers with 64 apartments, almost all 3 and 4 BHK. As the whole project is booked, this guide starts with booking transfers, then covers RERA dates, homes, towers and location.
Is This the Right Project?
The natural buyers are families wanting a spacious new apartment in the city centre, in a small building instead of a large campus. Independent houses and ageing apartment blocks dominate Koramangala, so a new project is uncommon. People employed on the Inner Ring Road, in Koramangala or in HSR Layout get a short commute.
It suits less those seeking a 2 BHK, immediate possession or large open grounds. Any purchase now is a takeover of some earlier buyer's booking, since nothing is unsold.
What It Costs and How a Purchase Works Now
At launch a 3 BHK started from Rs. 3.16 Crore, a 4 BHK from Rs. 3.9 Crore. On built-up area that equals roughly Rs. 16,300 and Rs. 16,500 a sq ft respectively. Karnataka RERA's July 2026 update marks all 64 homes and all parking spaces booked.
Homes come up only when existing buyers sell, each at a negotiated price. Until handover, this is done as a booking transfer. The steps and costs are:
- The seller's payments so far, plus any premium
- Instalments still owed to the developer on the original schedule
- The developer's transfer fee and written consent
- GST on those instalments, as the building is unfinished
- Stamp duty at 5% (5.6% including cess and surcharge) for a home above Rs. 45 Lakhs
- Registration at 2%
Set the offered homes beside their asking prices. Loan figures can be run on the EMI calculator.
Registration and Stage of Construction
The Karnataka RERA registration, PRM/KA/RERA/1251/310/PR/080223/005702, dates from February 2023 and names Shriram Properties Limited as promoter. Completion is registered for 19 January 2027. Check the number on the state RERA portal.
Construction began in January 2023. In the quarterly update of July 2026 overall completion was 74%: Tower A 75%, Tower B 81%. Landscaping, lifts, finishing work and the occupancy certificate come before handover, so expect possession during 2027.
Apartments and Their Sizes
There are 23 four-bedroom homes, 40 with three bedrooms and a lone 2 BHK at the top of Tower B. In built-up terms the 4 BHK is around 2,360 sq ft and the 3 BHK around 1,940 sq ft. Carpet areas, as always, are lower.
The registration has these carpet areas, with approximate sq ft equivalents:
- 2 BHK: 940 sq ft (87 sq m)
- 3 BHK: 115 sq m (1,243 sq ft) to 117 sq m (1,257 sq ft)
- 4 BHK: 142 sq m (1,524 sq ft) to 144 sq m (1,551 sq ft)
Every home adds a private balcony measuring 3 to 7 sq m. Since carpet is roughly 64% of the built-up size, judge rival projects on carpet area.
Layout of the Towers
The plot is 4,751 sq m, about 1.17 acres, of which buildings take 1,396 sq m. That leaves around 70% of the land open. Parking is in one basement common to both towers.
The tower figures are:
- Tower A has 31 homes over ground plus seven floors
- Tower B has 33 homes over ground plus eight floors
- Each tower's typical floor has four homes
- 158 car parks, 138 of them covered
Low-rise buildings mean short lift waits and few neighbours per floor. Approved facilities include a swimming pool, a clubhouse measuring 307 sq m, a gym and an indoor games area. Other amenities are a concierge desk, a barbecue area, a yoga deck and a squash court.
Where It Is
The plot covers Site Nos. 91 to 98, within HBCS Layout, Nirguna Mandir Layout, Bengaluru 560034. This is 1st Block's Ejipura section, with a road to its north and private property on its other sides. Plan approval, from the Bangalore Development Authority, is dated 11 January 2023.
Nearby places are:
- The Inner Ring Road, the link to Indiranagar and Domlur
- Hosur Road, for the drive to Electronic City, and Christ University beside it
- The Sony World junction, plus the restaurants and shops of Koramangala's inner blocks
- Two hospitals: St John's Medical College Hospital and, on Old Airport Road, Manipal
Most journeys are by road, as Koramangala still lacks its own metro station. The Koramangala locality page has more.
Before Taking Over a Booking
These points safeguard the buyer of a booked home here:
- The sale agreement held by the seller, with each payment receipt
- A consent letter and a statement of the flat's dues, both from the developer
- The RERA number in the agreement, checked against the portal
- The delay clause and possession date the incoming buyer takes on
- Carpet and balcony areas of the flat, and its pair of allotted parking spaces
- The release letter of the seller's lender, if the booking is under a home loan
Given the ticket size, a lawyer should go through the transfer papers. A site visit shows finishing progress. The Shriram Properties page has the rest of the builder's projects.