Seven Sarjapur by Fortune Primero: Carpet Areas, RERA Entry and Site Progress (October 2026)

By Book A Home Editorial Team·3 November 2026·5 min read
Seven Sarjapur by Fortune Primero: Carpet Areas, RERA Entry and Site Progress (October 2026)

East Bangalore's Sarjapura village is the site of a new high-rise from the developer Fortune Primero LLP. On the RERA register it appears as Seven Sarjapur, and its trade names are Fortune Seven and Fortune Primero Seven. Registration details, sizes, construction progress as of October 2026 and pre-booking checks follow.

Registration in Brief

The table gathers what the registration records.

ItemDetail
Promoter, nameFortune Primero LLP; Seven Sarjapur
RegistrationPRM/KA/RERA/1251/308/PR/260226/008489, issued 26 February 2026
Tower designFour towers of 41 floors, with three basements under a stilt level, 129.9 metres tall
Homes per towerTower 4: 287; the other three towers: 164 each; total 779
Land for homesAbout 10.9 acres, or 44,110 sq m
Parking provided75 spaces in the open, 926 under cover
FAR2.75 (sanctioned)
CompletionProposed for 31 March 2030

In marketing, the project is a 15-acre development of roughly 11 acres of homes and 4 acres of shops and offices. RERA covers the homes alone. Approvals and a timeline for the shops-and-offices zone must be sought separately.

Sizes of Homes

Three-bedroom homes are the largest group, at 571 of the 779. The table lists carpet areas converted from square metres, plus a balcony for every home.

NumberTypeCarpet area (approx.)
51 BHK575 sq ft
1212 BHK, 2 bathroomsBetween 760 and 800 sq ft
1233 BHK, 2 bathroomsBetween 905 and 950 sq ft
4483 BHK, 3 bathroomsBetween 990 and 1,100 sq ft
824 BHK, 3 bathroomsBetween 1,190 and 1,310 sq ft

The area on which a price is quoted is larger, as it takes in walls, balconies and a slice of common spaces. A like-for-like comparison uses the price of each carpet sq ft. Tower 4 has seven homes per floor and the other towers four, a point for anyone who wants quiet landings and quick lifts.

Getting There

The site is formed by land parcels 616 and 615/1 with 615/2, 428/2P with 427, and 425/1 with 421/1P and 421/2P, within Sarjapura hobli of Anekal taluk (PIN 562125). It is in Sarjapur town, near where Sarjapur Road ends and the Attibele and Hosur Road routes start. A radial road of 60 metres is proposed along the south edge, and the approved plan should confirm it.

Links to the Outer Ring Road, Bellandur and Wipro's campus branch from Sarjapur Road, with Electronic City reached through Attibele. Better than a map is a working-day drive at office hours. Satellite Town Ring Road also crosses the belt, and its planning authority approved the building plan.

Plans for the long run include SWIFT City, announced by the state as an office and innovation district at Sarjapur, and Namma Metro's Red Line (Phase 3A), proposed between Sarjapur and Hebbal. Both remain proposals, so any purchase should rest on present roads and services.

Amenities and Open Land

Six skybridges link the towers at different levels, bearing walkways, gardens and viewing decks. They distinguish the design, and years later the owners' association will have to maintain them. It is fair to ask beforehand what that maintenance will cost.

Roughly 86% of the plot, 37,890 sq m, is kept open. The amenity areas in the registration are tabulated here.

FacilityRegistered area
Pool379 sq m, alongside a community hall and gym
Sports, indoor940 sq m
Sports, outdoor767 sq m
Club houseAn area of 3,464 sq m (nearly 37,300 sq ft)
Parks4,416 sq m

Promotions show the club house at roughly 45,000 sq ft, above the registered number. The agreement for sale decides which figure applies.

Pricing and Total Budget

Allotment of units began in early March 2026; launch prices were changed by the developer with effect from 9 March 2026. Where tower, floor and view differ, prices differ, so ask for the most recent price sheet and the cost breakdown, with prices for the home type in writing.

The budget needs to include several more items:

  • 5% GST, as the homes are being built
  • 2% for registration
  • Stamp duty: 5.6% including cess and surcharge, on homes costing over Rs. 45 Lakhs
  • Deposits for water and electricity connections
  • Club membership, parking, advance maintenance and a corpus fund
  • Floor rise and preferred-location charges

As possession is some years off, loan interest on drawn amounts can run alongside rent. To see whether that fits income, try the EMI calculator before any booking payment.

RERA Status and Site Progress

Work on site started on 1 March 2026. A quarterly update dated 15 July 2026 went to Karnataka RERA, showing 10% done. Registered completion: 31 March 2030. The registration can be verified on the authority's portal under Seven Sarjapur.

A possession month of December 2030 is mentioned on some portals. What binds the developer is the date in the RERA record and the agreement for sale. A later date in the agreement needs a written explanation.

STRRPA granted building plan approval on 6 February 2026 (STRRPA/TP/CC/273/2025-26). Transferable development rights: not used. Complaints against the registration, as of October 2026: none.

About Fortune Primero

Before this launch, Fortune Primero, based in Bangalore, worked on commercial real estate. This is the firm's first housing project and the firm's first registration with Karnataka RERA; it therefore has no finished housing to show.

Under a joint development agreement, landowners and developer share the land. For the unit picked, the split of flats should be spelled out. Where a unit is in the landowner's share, the landowner sells it, and the developer is a confirming party.

Pre-Booking Checklist

New launches from first-time housing developers repay a careful read. Work through the points below.

  1. Compare the unit number, floor, tower and carpet area in the cost sheet with the registration.
  2. Get the sanctioned plan and check that approval covers every floor, all 41, of the tower.
  3. Ask about water supply, as borewells and the local panchayat are the registered sources.
  4. Learn whose share the unit is in, the developer's or the landowner's.
  5. Payments belong in the RERA-designated project account only.
  6. Study the payment schedule and what the agreement says on compensation for delay.
  7. Check with banks whether the project has home loan approval.
  8. Get the commercial zone's status and approvals written down if they affect the decision.

Projects on a shortlist in other parts of East Bangalore need the same scrutiny. A property lawyer can read the papers side by side to compare them.

Frequently Asked Questions

Is Fortune Primero Seven registered with RERA?+
Yes. Entered on the register as Seven Sarjapur, the project carries PRM/KA/RERA/1251/308/PR/260226/008489, dated 26 February 2026, in the name of the promoter, Fortune Primero LLP.
When will Fortune Primero Seven be ready?+
The target is March 2030 (RERA completion date: 31 March 2030). The July 2026 update showed 10% completion.
How big is Fortune Primero Seven in homes?+
779 apartments, spread over four towers rising 41 floors. Tower 4 holds 287; the remaining three towers hold 164 apiece.
What home sizes does Fortune Primero Seven offer?+
Carpet areas under RERA: 2 BHK between 760 and 800 sq ft; 3 BHK between 905 and 1,100 sq ft; 4 BHK between 1,190 and 1,310 sq ft.
Where exactly is Fortune Primero Seven?+
In East Bangalore at Sarjapura village (PIN 562125, Anekal taluk), close to where Sarjapur Road ends and the Attibele route begins.