Book A Home
Sattva Park Cubix Phase 2
ONGOING

Sattva Park Cubix Phase 2

ApartmentsDevanahalli, BangalorePrice on Request RERA: PRM/KA/RERA/1250/303/PR/280225/007529

Sattva Park Cubix Phase 2 is an ongoing apartment project by Sattva Group in Devanahalli, Bangalore. It brings 798 homes to Devanahalli Town in seven towers, each rising 14 storeys over two basement levels plus a lobby floor. Karnataka RERA has set 15 September 2029 as the deadline for this phase.

Homes start with studios and go up to three bedrooms. Of the total, 126 are studios, 207 have a single bedroom and 180 have two, while 285 more are split between 2.5 BHK and 3 BHK layouts.

Phase 2 is registered on 8.93 acres within the wider Park Cubix site, which spans about 18 acres in all. Next door is Sattva Park Cubix, the first phase, whose ten towers were handed over with occupancy certificates during 2023. This phase builds Crystal, a second clubhouse beside the existing Gold Leaf.

The airport is around a 10-minute drive away. Buyers had taken 481 homes by June 2026, when work on site had reached 40%. Both phases will share the campus roads and clubhouses.

Project Highlights

Property Type
Apartments
Total Land Area
8.93 Acres
No. of Units
798 Units
Towers & Blocks
7 Towers (Towers 13 to 19)
Floors per Tower
2 Basements + Ground + 14 Floors
Possession
September 2029
Construction
Under Construction (40% complete, June 2026)
Open Space
75%
RERA No.
PRM/KA/RERA/1250/303/PR/280225/007529
Price
Price on Request
Location
Devanahalli, Bangalore

Sattva Park Cubix Phase 2 Exclusive Price

Unit TypeSize (SBA)Approx. All Inclusive Price
Studio—Price on Request
1 BHK—Price on Request
2 BHK—Price on Request
2.5 BHK—Price on Request
3 BHK—Price on Request

Sattva Group shares prices on request; they change with tower, floor and facing. GST, stamp duty, registration and the charges billed at handover are extra.

Sattva Park Cubix Phase 2 Price Details

Sattva Park Cubix Phase 2 pricing is released by Sattva Group on request, and each quote depends on tower, floor and facing. Tell us the home type you like and we will send the current sheet.

Payment schedule

Fifteen staged payments make up the price. Buyers pay 5% to book, another 5% soon after and 10% as the first instalment. Eleven instalments of 7% follow, with a final 3% due at handover.

Taxes and the registration fee come over and above the sale value. Infrastructure, club and legal charges plus the upkeep deposit fall due with the last payment.

Location

Survey Nos. 341/1, 342/1, 342/2, 343/1, 343/2, 345/2, 359, 360, 361/2, 362/1, 362/2 and 367/1, Devanahalli Village, Kasaba Hobli, Sulibele Road, opposite KRN Complex, off NH-207, Devanahalli Town, Bengaluru Rural, Karnataka 562110

Landmark: Devanahalli town

Sattva Park Cubix Phase 2 is located off NH-207 on Sulibele Road, facing the KRN Complex in Devanahalli Town, 562110. On paper the site belongs to Devanahalli Village in Kasaba Hobli, Bengaluru Rural. Other options nearby are on our Devanahalli property page.

How long are the drives?

Kempegowda International Airport takes about 10 minutes, and Akash International School about 8. Reaching the town centre takes 2 minutes, with Devanahalli Circle a minute further. Manyata and Kirloskar tech parks take close to 25 minutes, and Whitefield nearer 30.

Master Plan

Sattva Park Cubix Phase 2 master plan showing Phase 1 and Phase 2
Enquire Now

Master Plan

Floor Plans

Sattva Park Cubix Phase 2 floor plans cover five Vastu-aligned layouts. Carpet sizes for each one are listed below:

  • Studio: close to 276 sq ft
  • 1 BHK: close to 425 sq ft, plus a roomier Grand version
  • 2 BHK: from roughly 680 sq ft
  • 2.5 BHK: from roughly 870 sq ft
  • 3 BHK: from roughly 1,048 sq ft, rising past 1,100 sq ft

The smaller homes, from studios to two bedrooms, are concentrated in the Dice and Quartz blocks. Bigger 2.5 and 3 BHK layouts take up the Pentamix and Diamond towers, along with Tower 19.

Amenities

Gymnasium
Swimming Pool
Jogging Track
Landscaped Gardens
Basketball Court
Squash Court
Banquet Hall
Multipurpose Hall
CCTV Surveillance

Sattva Park Cubix Phase 2 amenities draw on two clubhouses that serve the whole campus. Gold Leaf already runs for first-phase owners, while Crystal is going up with these towers. Three quarters of the phase is set aside for greenery.

Facilities planned for residents include:

  • A pool and an indoor gym
  • Badminton and squash indoors
  • Basketball and cricket
  • Banquet and party halls
  • Indoor games, plus a play room for kids
  • Parks for children and for seniors
  • Jogging track, plus a gathering plaza

A mall with a multiplex is also planned. Cameras watch the entrances.

Sattva Park Cubix Phase 2 Specifications

Sattva Park Cubix Phase 2 specifications begin with a reinforced concrete frame filled in with Porotherm or cement blockwork. Vitrified tiles cover the living areas and bedrooms, with anti-skid ceramic in wet areas.

Inside doors are painted flush shutters, and the entrance door carries veneer with melamine polish. Each bathroom gets chrome fittings, a wall-hung WC and a shower mixer. Sanctioned power is 3 kVA for the two smallest types, 4 kVA for 2 and 2.5 BHK homes, while three-bedroom homes get 5 kVA.

Sattva Park Cubix Phase 2 RERA and Approvals

Sattva Park Cubix Phase 2 is registered with Karnataka RERA as PRM/KA/RERA/1250/303/PR/280225/007529 since February 2025, under the name "Park Cubix Phase 2". Sattva Resi Private Limited is the registered promoter, and a Salarpuria group company is the landowner.

Plan and clearances

Building plans were sanctioned by the airport-area planning authority, BIAAPA, in February 2025. Clearances for fire, power, pollution, aviation height and the environment have been obtained.

Phase 1 carries its own older number, PR/171023/001749. Check that any Phase 2 agreement quotes the 2025 registration.

Sattva Park Cubix Phase 2 Construction Status

Sattva Park Cubix Phase 2 construction reached 40% in the quarter to June 2026, having begun on 1 September 2024. Foundations are finished for every tower, and about two thirds of the concrete frame is up.

Tower 16 leads at 77%, ahead of Tower 15 at 71%, Tower 13 at 59% and Tower 14 at 53%. The Quartz towers, 17 to 19, were at 12% to 15%. RERA completion is due on 15 September 2029, and we can share newer site photos.

About Bangalore

Bangalore, officially known as Bengaluru, is the capital of Karnataka and one of India's most dynamic metropolitan cities. Renowned as the country's Silicon Valley, Bangalore has evolved from a peaceful garden city into a global technology and innovation hub. The city is home to leading IT companies, multinational corporations, startups, research institutions, and business parks, making it a…

Read more about Bangalore →

Frequently Asked Questions

What does a flat in Sattva Park Cubix Phase 2 cost?
Prices are quoted on request and change with the floor, tower and direction. We send the latest sheet for whichever layout interests you.
Is Sattva Park Cubix Phase 2 separate from the first Park Cubix phase?
Yes. It has its own RERA number, towers 13 to 19 and the new Crystal clubhouse, while sharing the campus with the phase finished in 2023.
How many flats are still open in Sattva Park Cubix Phase 2?
About 317, since 481 of 798 were booked by June 2026. We confirm live stock tower by tower before any visit.
How big are the homes in Sattva Park Cubix Phase 2?
Carpet sizes run from roughly 276 sq ft for a studio to over 1,100 sq ft for the largest 3 BHK.
What is the completion date of Sattva Park Cubix Phase 2?
15 September 2029, as registered with Karnataka RERA. Work was 40% done in mid-2026.
How many floors are in each tower of Sattva Park Cubix Phase 2?
Fourteen upper floors in every tower, over a lobby level and two basements used for parking.

Write a Review

About the Builder

Sattva Group
Sattva Group

Est. 1993

Sattva Group, formerly known as Salarpuria Sattva, is one of India's most respected real estate developers with a strong presence across major metropolitan cities. Established with a vision to create high-quality residential, commercial, retail, and IT infrastructure projects, the company has earned a reputation for innovation, transparency, timely delivery, and customer-centric development…

Ongoing: 30+Completed: 30+
Read more about Sattva Group →

Similar Projects