Total Environment in Bangalore: What the Phase Dates Mean for a Buyer

By Book A Home Editorial Team·26 October 2026·7 min read
Total Environment In That Quiet Earth in Off Hennur Road

Buying from Total Environment means paying for design and then waiting for it to be built. The company draws every project afresh, gives most homes a private garden and leans on exposed brick, stone and wood. This article explains the firm, its Bangalore communities, the completion date on file for each phase and how to protect a booking.

Reading the Dates First

The phase-wise record on the state RERA website tells the most about this developer. Every phase is registered on its own, so dates differ even inside one project. The table lists what was on file on 3 October 2026, ordered by current completion date.

Current datePhaseOriginally dueRegistered
30 April 2022Phase 1 of After the Rain30 June 2019October 2017
30 September 2024Phase II A of After the Rain31 December 2022May 2018
30 September 2024Learning to Fly31 December 2023October 2017
1 August 2026Phase IIB of After the Rain1 November 2024October 2019
30 September 2026The first phase of In That Quiet Earth31 December 2025May 2018
30 September 2026Phase 2a of The Magic Faraway Tree31 December 2024December 2018
31 December 2026Phase 2a of In That Quiet Earth31 December 2025October 2020
30 March 2027Phase 2 of Pursuit of a Radical Rhapsody30 June 2026January 2019
30 April 2027Phase 1 of Pursuit of a Radical Rhapsody31 July 2024October 2017
30 September 2027Phase 2 of The Magic Faraway Tree31 December 2023October 2017
1 April 2028Phase IIC of After the Rain1 April 2028March 2022
1 May 2028Phase 2B of In That Quiet Earth1 May 2028July 2022
31 December 2028Tangled Up in Green31 December 2028January 2024
30 September 2029Tower 8 of Pursuit of a Radical Rhapsody30 September 2029September 2022
1 December 2029Tower 5 of Pursuit of a Radical Rhapsody1 December 2029December 2022
28 February 2030Phase 1 of Over the Rainbow28 February 2030April 2024
31 March 2031Phase 2C of In That Quiet Earth31 March 2031April 2024
31 May 2031Down by the Water31 May 2031August 2024
30 April 2032Phase III of After the Rain30 April 2032August 2025
31 December 2032Tower 8 of In That Quiet Earth31 December 2032January 2025

Phases registered in 2017 and 2018 have largely slipped, a few by between two and four years. Newer phases begin with long timelines, and the dates on file for them run from 2028 to 2032.

What the Wait Costs

A long build lifts the real price of a home though the quoted price stays put. Rent and loan instalments overlap throughout, and with a construction-linked plan the interest bill grows as stages are drawn. Try the EMI calculator to gauge the instalment before booking.

Plan around the date on the registration, which is the promoter's commitment under the Act. Ask for the identical date in the sale agreement for that phase. Once it has passed, section 18 lets the buyer claim interest on the delay or take a refund with interest.

A highly individual home may also take longer to resell than a standard apartment. The large ticket size narrows the pool of buyers at any moment.

The Company and Its Founders

Total Environment was founded in Bangalore during 1996 by the architect couple Kamal Sagar and Shibanee Sagar. Kamal Sagar now leads it as chairman and managing director. Design and construction happen under one roof, along with a large part of the carpentry and interior work. A summary of the city homes is on the Total Environment page.

As a private company it shares limited financial information. Group companies hold the registrations, among them Total Environment Habitat, Total Environment Constructions and Total Environment Building Systems. The sale agreement names the entity whose registration needs reading.

What a Total Environment Home Looks Like

Terraces with planted soil beds and drip watering are part of most apartments, even above the ground floor. Walls in exposed brick or concrete are common, and the handover usually includes kitchens, wardrobes and carpentry.

Names for the projects are borrowed from songs and books. Plans are roomy, many with a study, home office or staff room, and buyers generally choose among interior finishes, which lengthens the design process.

Pricing follows from this approach. A rate that looks high is paying for finished interiors, terraces and fewer homes per acre than a regular tower. Comparisons with other projects should therefore weigh what each home includes.

Communities Across the City

The company has built in several directions, and a few projects lie outside the city limits. They are grouped by area below.

  • North Bangalore: villas and apartments in After the Rain at Yelahanka, Down by the Water at Jakkur (August 2024), and the Hennur Road community In That Quiet Earth, whose last tower dates from 2025
  • East Bangalore: two Whitefield neighbourhoods, one finished (Windmills of Your Mind, with apartments and villas) and one still being added to in stages (Pursuit of a Radical Rhapsody)
  • South Bangalore: two apartment projects, which are The Magic Faraway Tree off Kanakapura Road and Learning to Fly in JP Nagar
  • Outside the city: villas called Over the Rainbow near Nandi Hills (Chikkaballapura district), and a plotted layout, Tangled Up in Green, registered at Devanahalli in January 2024

Is It the Right Match?

The homes will please a buyer planning decades of residence, who prizes design, gardens and finished interiors over an early move-in. So is a family whose current home is already settled and who can afford to wait. If keys are required by a set date, a completed Total Environment home or another builder's ready project is the better answer.

Before You Book

Seven steps apply to every home from this developer, new or resale.

  • Pull up the Karnataka RERA page for the phase or tower, and note down who the promoter is, its registration number and the completion date.
  • Set the quarterly progress filings for that phase against the work visible on site.
  • Have the carpet area quoted in sq ft, and the garden terrace figure quoted apart from it.
  • Get a cost sheet that spells out GST, car parking, club fees, interior upgrades and maintenance deposits.
  • Confirm that the agreement's handover date and its clause on delay match the registered date.
  • If the home is complete, ask to see its occupancy certificate and the khata for the block.
  • Spend an afternoon in a finished community, Windmills of Your Mind for instance, and look at how the gardens and finishes have held up.

These steps are equally useful when weighing other developers. For current prices on any Total Environment project, ask our team, and look on the project pages for the registration number.

Frequently Asked Questions

Who is behind Total Environment?+
The architect couple Kamal Sagar and Shibanee Sagar set up the Bangalore company in 1996. Kamal Sagar leads it as chairman and managing director.
Why is the pricing of Total Environment homes high?+
Payment buys individual design, planted terraces, natural materials and ready interiors. Big homes also mean a big overall ticket, whatever the rate per sq ft.
Do Total Environment projects run late?+
Many have. A number of phases from 2017 and 2018 now show dates that are two to four years later, and new phases carry dates between 2028 and 2032.
Where is Total Environment still building around Bangalore?+
Building continues in the north at After the Rain, Down by the Water and In That Quiet Earth, in Whitefield at Pursuit of a Radical Rhapsody, and on the Devanahalli plots of Tangled Up in Green.
What is the single most important check for a buyer?+
Study the state RERA entry for the exact phase or tower. It reveals the promoter company, the completion date on file and the progress updates filed each quarter.