Total Environment Down by the Water: Jakkur Lake Homes, Prices and RERA (October 2026)

Beside Jakkur Lake, Total Environment is constructing Total Environment Down by the Water, a high-end apartment development in the north of Bangalore. Building has begun, and RERA records 31 May 2031 as the date it should be complete. Read on for its address, registration, unit sizes, pricing, facilities, the builder, the right buyer and pre-booking checks.
Where It Is and How to Reach It
The land, about 10.2 acres or 41,459 sq m, takes in survey numbers 6/2, 7/2 and 6/1 of Gashtikempanahalli, a village of Yelahanka hobli, postal code 560064. Jakkur Lake forms its whole western boundary, which keeps that side unbuilt. Jakkur itself is a quiet residential area off Bellary Road, with Hebbal to the south and Yelahanka to the north.
From Jakkur, NH 44 (Bellary Road) heads one way to Hebbal and the other way to the airport, Kempegowda International. The largest office cluster close by is Manyata Tech Park, beside the Outer Ring Road. Residents will find schools, hospitals and markets around Sahakara Nagar, Yelahanka and Jakkur.
Work continues on the metro Blue Line to the airport along Bellary Road, and a stop is planned at Jakkur Cross. Its launch has been pushed back repeatedly, so treat the metro as a bonus for later. Before deciding, try the drive to the office at peak time.
Registration on RERA
One registration covers the full project: PRM/KA/RERA/1251/472/PR/090824/006967, granted by Karnataka RERA on 9 August 2024. Its listed start is 1 July 2024, with completion due by 31 May 2031. In October 2026 this was still the first finish date, with no extension taken.
The promoter on record is Total Environment Building Systems Private Limited, while the land owners sign on as co-promoters under a joint development deal. The Bruhat Bengaluru Mahanagara Palike cleared the plan on 1 July 2024, and BWSSB supplies water. In October 2026 the portal showed zero complaints.
Towers, Units and Carpet Areas
There are 602 flats in five towers, and each tower rises to a ground floor plus 16 upper floors over two basements. Tower 1 carries 66 homes at four a floor; each of the other four towers, Towers 2 to 5, carries 134 homes at eight a floor. RERA logs every flat as a 3 BHK, in these carpet ranges:
- 1,717 sq ft (lowest) up to 1,725
- 1,839 sq ft (lowest) up to 1,845
- 1,995 sq ft
The record sets aside 1,204 covered parking spaces and 25 open spaces, giving every home two covered slots. Sales sizes are bigger because they use saleable area.
Price List and Total Outlay
Five layouts are sold, priced between Rs. 5.62 Crore and Rs. 14.6 Crore.
| Layout | Starting at | Saleable area (sq ft) |
|---|---|---|
| 3 BHK and study | Rs. 5.62 Crore | 2,490 |
| 3 BHK and home office | Rs. 5.91 Crore | 2,628 |
| 3 BHK and study, home office and maid's room | Rs. 7.27 Crore | 3,240 |
| 4 BHK and study, home office and maid's room | Rs. 11.2 Crore | 4,980 |
| 4 BHK and study, home office and maid's room | Rs. 14.6 Crore | 6,480 |
Each layout comes to roughly Rs. 22,500 per square foot of saleable area. The two top layouts are pitched as 4 BHK even though RERA registers only 3 BHK flats. Anyone taking the 4,980 or the 6,480 layout should see how the agreement records it and which registered flats are combined.
On the cheapest home, registration at 2% and stamp duty at 5.6% (cess and surcharge included) total close to Rs. 42.7 Lakhs. GST for a home under construction, floor premiums, parking and deposits are charged separately, so ask for an itemised cost sheet.
Here is an illustration on that Rs. 5.62 Crore unit. Since loans larger than Rs. 75 Lakhs are capped at 75% of value, the buyer puts in 25% (near Rs. 1.41 Crore) and borrows around Rs. 4.21 Crore. Over 20 years at 8.5%, the instalment comes to near Rs. 3.66 Lakhs every month, and our EMI calculator covers other inputs.
The timeline is a cost as well. With handover set for May 2031, a construction-linked loan charges interest on each stage released for years, and a tenant pays rent alongside until moving in.
Facilities on Site
Around 78% of the land stays open, per the RERA record, and the anchors are a clubhouse of 24,000 sq ft and a path by the lake. Other features:
- A pool, with a separate heated pool
- Fitness room, squash, badminton and a tennis court
- Home theatre, reading room, lounge and indoor games
- Rooms for guests and a hall for events
- Pharmacy, clinic, cafe and a small store
- Spa with salon
- Tracks for cycling and jogging, and a club for dogs
- A kids' play zone
Who Builds It
Total Environment began in July 1996 in Bangalore and has projects in this city as well as Hyderabad and Pune. Its signature is terrace gardens, bare brick walls and close attention to interiors. eDesign, its own design software, lets buyers set their layouts and finishes.
All that detail means slower building, and several past Total Environment phases in the city have had finish dates extended on RERA. Seeing a completed community of theirs shows how the landscaping, joinery and shared spaces age.
The Right Buyer
This suits a household after an unusually large lakeside home that can wait till 2031. At 2,490 sq ft, the base plan is larger than most North Bangalore 4 BHK flats, and spending starts over Rs. 5.5 Crore. Households needing keys in two or three years have ready and near-ready choices across North Bangalore.
Pre-Booking Paperwork
At this ticket size, insist on written answers to each point below.
- Cross-check the agreement against the portal for the registration, the promoter's name and the completion date.
- Get the exact flat's carpet area in writing and weigh it against the quoted saleable size.
- Fix the tower, level and outlook, because lake views carry a premium.
- Visit the site and read the most recent quarterly filing on RERA.
- Get legal advice on the title, the development agreement with the land owners and the lake buffer marked on the plan.
- Go over the clauses on delay compensation and customisation.