A Buyer's Guide to Subram Jade Gardens, Tumkur Road (October 2026)

Subram Jade Gardens is an under-construction apartment project from Subram Builders in North West Bangalore, at Doddabidarakallu off Tumkur Road. Its 175 homes are in three low-rise blocks covering close to 3 acres, and the registered date for completion is 31 December 2026.
Where It Is and How to Reach It
The site is Survey No. 165, with Municipal No. 06/165, at Doddabidarakallu in Bangalore North Taluk's Yeshwanthpur Hobli. Doddabidarakallu is a residential area within city limits on the western side of Tumkur Road. Its building plan has BBMP sanction.
NICE Road and Tumkur Road, which is NH 48, are the main routes. The neighbourhood's metro station is Nagasandra, a Green Line stop. Heading to the city on Tumkur Road, a driver passes the Dasarahalli market stretch and the Peenya industrial area.
The inner roads are not as wide as the highway, so test-drive the last stretch from main road to site. Try the school and workplace commute in peak hours before choosing.
Is It the Right Fit?
Families wanting a 2 BHK or 3 BHK of middle size, in a low building near Tumkur Road, are the natural buyers. Each block stops at four floors over the ground floor, which keeps the community moderate. It also suits buyers employed along the Namma Metro Green Line or at the Peenya industrial area.
Anyone wanting a large township full of facilities or a big listed developer should look at other options. This small local firm has extended completion twice, so judge progress on a site visit before paying anything.
RERA Registration and Stage of Work
The Karnataka RERA authority issued registration PRM/KA/RERA/1251/309/PR/210804/004238 on 4 August 2021. The promoter, Subram Builders, is a proprietorship firm developing the land jointly with its owner. A BBMP commencement certificate was issued in February 2021.
31 August 2024 was the original registered completion date, then pushed to 31 August 2025, and after that to 31 December 2026. The February 2025 plan modification showed 54% of the work complete and 46% remaining. A visit will show what the three blocks have added since.
Subram Builders has two earlier apartment projects, making this its third. Subram Enclave was constructed from 2012 to 2015 and Subram Arcade from 2007 to 2009. Finished quality can be seen at either.
Blocks, Home Types and Sizes
Each of the three blocks rises four floors above a ground floor and a basement. The plans span 1 BHK and 3 BHK apartments besides the 2 BHK, which is the biggest group, and some have a study added. The block-wise split is:
- Block C: 95 homes (19 per floor), both 2 BHK and 3 BHK
- Block A: 70 homes (14 per floor), largely 2 BHK and a handful of 1 BHK
- Block B: 10 homes (two per floor), all of them large 3 BHK
Registered carpet areas are:
| Home type | Carpet area (sq ft, approx.) |
|---|---|
| 1 BHK | 433 to 526 |
| 2 BHK | 810 to 982 |
| 3 BHK, Block C | 999 to 1,065 |
| 3 BHK, Block B | 1,469 |
At first the project was registered for 140 homes. The count rose to 175 when a modified plan was approved in February 2025, and that plan put the land area at 12,094 sq m. Roughly 37% of the land is under buildings, with the balance open, and that means about 59 homes to the acre.
Amenities scheduled are a swimming pool, a gym, a clubhouse, a community hall, parks, power backup and indoor as well as outdoor sports facilities. Ask which are ready and which remain in progress. Car park numbers differ between blocks, so check the one allotted to the home.
What It Costs
Prices for Subram Jade Gardens are available from the developer on request. Take the latest price sheet and weigh its carpet area rate against nearby projects off Tumkur Road. The final price depends on facing, floor and block.
On top of the agreement value come:
- GST if the home is purchased ahead of its occupancy certificate
- Stamp duty in three slabs (2% to Rs. 20 Lakhs, then 3% till Rs. 45 Lakhs, then 5%), along with cess and surcharge
- A 2% registration charge on the value
- Utility connection charges, car parking and the maintenance deposit
Use the EMI calculator for the monthly instalment on a planned loan amount. Banks pay out a loan for an under-construction home stage by stage as the building rises.
Pre-Purchase Checklist
With the timeline extended, check progress and paperwork closely:
- Verify the extension and RERA number on the Karnataka RERA website, then go through the latest quarterly update
- Obtain the modified sanctioned plan showing all 175 homes
- Establish whether the home is in the developer's share or in the land owner's
- Look at the precise block and floor on site to judge its stage
- Study the agreement for its possession date and the clause on compensation for delay
- Enquire about sewage arrangements and the source of water
- Have the whole cost sheet, with deposits, parking and taxes, put in writing
- Have a lawyer check the khata, title and joint development agreement
As the project approaches completion, prices and the homes available keep changing. The developer can arrange a site visit and share the list of homes still open.