A Buyer's Guide to Shriram Sapphire (Codename Ultimate), Bommasandra

Bommasandra, at the southern end of the Electronic City belt in South Bangalore, has a lakeside apartment project called Shriram Sapphire. Shriram Properties introduced it during March 2024 as Codename Ultimate, so buyers may meet either name for this one low-rise development.
The Buyer It Is Built For
The natural buyer is a couple or small family employed at Electronic City or in Bommasandra's industrial area, and keen on a low building instead of a tall tower. The lakeside 5.65 acres carry 414 homes, a mix of 2 BHK and 3 BHK, across six towers seven and eight floors high. Entry pricing is Rs. 95 Lakhs, with 5 November 2028 as the completion date on the registration.
That date is slightly over two years from October 2026. Factories and warehouses are neighbours, since this is an industrial belt. Anyone needing a 4 BHK, possession this year or a purely residential setting will be better off elsewhere.
RERA Number, Dates and Progress
Shriram Sapphire holds Karnataka RERA number PRM/KA/RERA/1251/310/PR/090224/006616, issued on 9 February 2024 with Shriram Properties Limited as promoter. Its building plan carries a 10 November 2023 approval from the Bangalore Metropolitan Region Development Authority. Karnataka RERA carries it as Shriram Sapphire, the registered name.
Work began on the registered start date of 1 December 2023. Overall progress was 50% in February 2026, and the update filed for the July 2026 quarter raised it to 56%. A sales team may mention another date, yet the seller is held only to the registered completion date.
The 5 acres 26 guntas belong to a landowner and are being built on through a joint development agreement, which is registered. The landowner's share takes some homes as a result, so the seller on the agreement may differ by home. Zero litigation is declared for the land, with the local authority and borewells as water sources.
Six Towers, Two Home Sizes
Towers A to F each have a single basement. Above the ground floor there are eight upper floors in Tower D and seven in each of the remaining five. The highest tower reaches about 27 metres, a short lift ride at most.
Two-bedroom apartments number 188 and three-bedroom apartments 226. Tower A, with 84 homes, is the biggest and Tower E, with 56, the smallest, while one typical floor has 8 to 12 homes. Parking is planned for 502 cars, 486 of them under cover.
| Configuration | Saleable (sq ft) | Carpet (sq ft) | Number of homes | Starts at |
|---|---|---|---|---|
| 2 BHK | 975 | 635 to 710 | 188 | Rs. 95 Lakhs |
| 3 BHK | 1,265 | About 850 | 226 | Rs. 1.33 Crore |
Saleable area, the basis for pricing, is carpet area with the balcony and a portion of the lifts, lobbies and clubhouse added. Carpet area is only what the home's own walls enclose.
Roughly 72% of the site stays open, landscaped on a Balinese theme with the lake behind. Amenities are a swimming pool, a clubhouse, a party hall, a gym, sports courts outdoors, a jogging track, an urban farming patch, a pet area and a play area for kids.
Price and Extra Costs
The 2 BHK, at 975 sq ft, opens at Rs. 95 Lakhs, which is about Rs. 9,750 per sq ft of saleable area. The 3 BHK, at 1,265 sq ft, opens at Rs. 1.33 Crore, or close to Rs. 10,500 per sq ft.
Beyond the agreement value, an under-construction purchase carries these costs:
- GST, applied to the value in the agreement
- Registration at 2% and stamp duty, charged in Karnataka at 5% with cess and surcharge added once the value crosses Rs. 45 Lakhs
- Premiums for floor rise and lake view
- An extra car park, the maintenance deposit and clubhouse charges
For a Rs. 95 Lakhs home, registration and stamp duty total roughly Rs. 7.2 Lakhs. As an example, Rs. 75 Lakhs is the largest loan that lending limits permit at this price. On a 20 year term at 8.5%, its monthly instalment is near Rs. 65,100, and our EMI calculator tests a different price or down payment.
Address and Travel Times
The address is Survey No. 72 of Bommasandra village in Anekal Taluk's Attibele Hobli, pincode 560099. This part of the Bommasandra industrial area has D-Mart Cross and KIADB's service road close by. To the north, the land ends at a lake that occupies Survey No. 73.
Bommasandra is the terminal of the Namma Metro Yellow Line from RV Road, which began running in August 2025. Drivers reach the city by NICE Road, Hosur Road and the elevated expressway through Electronic City. Electronic City offices supply most of the local jobs and rental demand.
Road travel times:
- 3 minutes: the elevated expressway, the Bommasandra metro stop and NICE Road
- 5 minutes: Electronic City's toll plaza
- 10 minutes: AMR Tech Park, RGA Tech Park and Velankani Tech Park
- 15 minutes: Delhi Public School, Alliance University and National Public School
Who Is Building It
Listed developer Shriram Properties, of the Shriram Group, builds in Chennai, Pune, Kolkata and Bangalore, and Sadashivanagar houses its Bangalore office. It frequently starts sales under a codename and gives the final name afterwards, as happened with Sapphire. The allotment letter, the RERA certificate and the agreement must all show Shriram Sapphire.
Booking Checklist
A half-built project lets a buyer verify far more at the site than a fresh launch does. Cover these points:
- Check the flat number, the tower and the floor against the project's entry with Karnataka RERA
- Confirm which share holds the home, the developer's or the landowner's, and who will sign the agreement for sale
- Obtain written carpet, balcony and saleable areas for the specific home
- See the tower and check its progress against the most recent quarterly update
- At the lake edge, ask about upkeep of the boundary and buffer
- Time the visit for a working day and assess industrial noise and truck movement
- Send every payment to the RERA-registered project account
Open homes vary with tower and floor as bookings come in. Reach out to us for the latest price sheet and for the homes currently available.



