Purva Silversky, Hebbagodi: Prices, Homes and RERA Facts (October 2026)

By Book A Home Editorial Team·11 November 2026·5 min read
Purva Silversky

Puravankara's Purva Silversky is a premium launch in Hebbagodi, South Bangalore, close to Huskur Road in the Phase 2 belt of Electronic City. It plans 356 homes in three 32-storey towers, weighted towards three and four bedrooms. This guide sets out the buyer profile, prices, homes, location, the developer, RERA facts and booking checks.

At a Glance: Who Should Look

Large apartments define this launch. Natural buyers are families working in Electronic City or on the Hosur Road belt who want a 3 or 4 BHK in a tall building. Budgets begin around Rs. 2.55 Crore, and handover is registered for July 2030.

A move needed in two to three years does not fit that date. One and two bedroom flats are absent, so buyers with less to spend should look at other options across Electronic City Phase 2. Big units also draw fewer resale buyers than smaller flats, worth weighing for a short hold.

What It Costs

Pricing for the 3 BHK starts at Rs. 2.55 Crore, and each unit's figure depends on its size, floor and view. Payments follow a yearly 15:20:20:20:25 schedule of five instalments rather than construction milestones.

Several costs come over and above what the agreement for an under-construction flat states:

  • Clubhouse charges, a deposit for maintenance and extra car parks if needed
  • View and floor-rise premiums
  • GST, levied on the agreement value
  • Registration at 2%, and in Karnataka 5% stamp duty with cess and surcharge on top for homes above Rs. 45 Lakhs

For a Rs. 2.55 Crore purchase, duty and registration total close to Rs. 19.4 Lakhs. Monthly figures for a chosen loan come from our EMI calculator. Base any per sq ft comparison on the carpet area of the actual flat on offer.

Inside the Towers

Towers A, B and C share a 6.99-acre site. Every tower has one basement, stilts and 32 upper floors, about 108 metres tall. Tower C has 120 homes while the other two have 118 each, giving roughly 51 homes per acre.

Four flats share most floor plates, which keeps each lift lobby small. Parking comes to 644 bays, with 604 covered. The registered break-up is shown here.

UnitNumberCarpet area
3 BHK288 units1,125 sq ft up to 1,362 sq ft
4 BHK65 units1,701 sq ft up to 2,303 sq ft
5 BHK3 units2,809 sq ft up to 2,998 sq ft

Carpet area measures the floor within the walls only. Saleable area, the basis for the price, adds balcony space plus a portion of shared areas, taking the smaller 3 BHK to around 1,864 sq ft. Some top-end units are duplexes or penthouses.

Hafeez Contractor is the architect. Over 45 amenities are spread through the grounds and a 17,000-plus sq ft clubhouse. They include a gym, a library, a forest trail, squash and badminton courts, a swimming pool, a games room and yoga decks.

Location Details

Records place the project on survey numbers 59/3, 58/1 and 60/16 in Hebbagodi (Attibele Hobli, Anekal Taluk), postal code 560099. The eastern boundary meets a road. Westward are the Veerasandra village limit and a KSIDC industrial estate, with private plots on the northern and southern sides.

The Yellow Line has run between RV Road and Bommasandra since August 2025, and its metro stops at Huskur Road and at Hebbagodi serve this side of Hebbagodi. Cars reach Silk Board via Hosur Road or the elevated expressway. NICE Road leads to Mysore Road as well as Tumkur Road.

Approximate drive times in regular traffic:

  • St. Francis de Sales Public School, about 3 minutes
  • M5 Ecity Mall, about 4 minutes
  • PES University in Electronic City, about 8 minutes
  • Tata Consultancy Services, about 9 minutes
  • Narayana Institute of Cardiac Sciences, about 12 minutes
  • Infosys campus, about 13 minutes
  • Wipro campus, about 18 minutes

Who Is Building It

Puravankara, a Bangalore developer listed on the stock exchanges and founded in 1975, runs three brands: Purva for premium homes, Provident for mid-range housing and Purva Land for plots. Purva Westend near Kudlu Gate, one of its completed Hosur Road projects, shows the build quality and maintenance buyers can expect.

RERA Status and Construction Stage

Plan approval from the Bangalore Development Authority came on 18 November 2025. Puravankara Limited was registered as PRM/KA/RERA/1251/310/PR/151225/008338 on 15 December 2025, listed on the state RERA website as Purva Silversky.

Work was registered to begin on 2 January 2026, with completion due on 30 July 2030, the date the seller is bound by. At this launch stage, the quarterly filing for August 2026 recorded zero floor slabs completed. Hebbagodi's city council (CMC) is to supply water, as planned.

Anyone booking in 2026 should plan to carry rent or an ongoing EMI for almost four years alongside the instalments. That cost belongs in the budget from day one.

Booking Checklist

With a high price and a long build, these steps are worth doing first:

  • Look up the chosen tower and unit in the K-RERA record online
  • Note how long it takes to reach the nearest Yellow Line station
  • Check the distance between the chosen tower and the industrial area to the west
  • Get written carpet, saleable and balcony areas for that unit
  • Insist on a cost sheet with maintenance, parking, GST and premiums each on its own line
  • Note every one of the five annual instalment dates before signing
  • Make payments only to the project account in the RERA registration

Stock varies across towers and floors week to week. Reach out to us for the homes still on offer here and a current price list.

Frequently Asked Questions

Is Purva Silversky registered under RERA?+
Yes. Puravankara Limited was issued Karnataka registration PRM/KA/RERA/1251/310/PR/151225/008338 on 15 December 2025, listed as Purva Silversky.
What does a 3 BHK at Purva Silversky cost?+
Rs. 2.55 Crore upwards, with stamp duty, GST and registration on top. Size, floor and view move the price, and a yearly 15:20:20:20:25 payment schedule is offered.
Which area is Purva Silversky in?+
It is in Hebbagodi village, close to Huskur Road in Electronic City Phase 2 (560099). Yellow Line metro stops at Huskur Road and Hebbagodi serve the area.
When is possession of Purva Silversky due?+
RERA lists 30 July 2030 for completion. Building work began in January 2026 and has only just started.
How many homes are in Purva Silversky?+
There are 356 homes in three 32-storey towers spread over 6.99 acres: 288 3 BHK, 65 4 BHK and 3 5 BHK units. Tower C has 120 homes, while the other two have 118 apiece.