Book A HomeReal Estate Advisory

Nambiar District 25 Township: Phases, Prices and Possession (October 2026)

By Book A Home Editorial Team·11 November 2026·5 min read
Nambiar District 25

Nambiar Builders' Nambiar District 25 is a large apartment township under construction in Dommasandra, reached from Sarjapura Road on Bangalore's east side. Its three RERA-registered phases add up to 20 tall towers and 2,814 homes.

Is It the Right Fit?

District 25 is aimed at families wanting a spacious flat in a township with on-site sports, a clubhouse and planned shops. Its likely buyers commute to Electronic City, the Wipro campus or offices on Sarjapura Road. Four flats per floor also gives more privacy than most towers.

Those who need to move in before 2030, or who cannot stretch beyond Rs. 1.70 Crore, may want to look elsewhere. A township this big is built in stages across many years, meaning early occupants will live alongside construction for a time.

Where It Is

The site is at Dommasandra, between Chandapura and Sarjapura Road, with the pincode 562125. Administratively it is Dommasandra Village, under Sarjapur Hobli and Anekal Taluk. Sarjapura Road runs north-west to Bellandur's stretch of the Outer Ring Road, and the Chandapura road joins Hosur Road near Electronic City.

Several international schools along Varthur Road and Sarjapur Road are close by. Plans include a metro station at Muthanallur, 600 m from the gate, and the Namma Metro Phase 3A Red Line along Sarjapura Road. Both remain proposals, so peak-hour road traffic is still what shapes the commute.

Overview

The master plan spreads across 100 acres, combining residential towers with a sports zone and a clubhouse, plus a commercial block on the drawing board. Highlights:

  • Developer: Nambiar Builders
  • Plans: two-, three- and four-bedroom flats, with 4 flats on each floor
  • Size range: 1,260 sq ft at the low end, 2,980 sq ft at the top
  • Lowest price: Rs. 1.70 Crore (2 BHK)
  • Delivery: January 2030 for the first phase, February 2032 for the last

Phases, Towers and RERA Numbers

The three phases are registered separately, each with its own towers and its own completion date. Because handover depends on the phase, a buyer should confirm it for the chosen flat. Phase details:

PhaseRERA registrationTowers and floorsHomesDue by
1PRM/KA/RERA/1251/308/PR/100125/007377Towers 1 to 6, 32-33 floors79626 January 2030
2PRM/KA/RERA/1251/308/PR/200825/008011Towers 7 to 12, 34 floors81631 August 2030
3PRM/KA/RERA/1251/308/PR/260526/008686Towers 13 to 20, 36-38 floors1,20229 February 2032

Registration dates were January 2025 (Phase 1), August 2025 (Phase 2) and May 2026 (Phase 3), and the BDA approved the plans. Phase 3, the most recent, is built around the sports zone.

Plans and Pricing

The 2 BHK opens at Rs. 1.70 Crore, and the largest home reaches Rs. 3.94 Crore. Plan by plan, with the smallest first:

AreaPrice fromPlan
1,266 sq ftRs. 1.70 CroreTwo-bedroom
1,498 sq ftRs. 2.01 CroreThree-bedroom, two baths
1,683 sq ftRs. 2.26 CroreThree-bedroom, three baths
2,043-2,051 sq ftRs. 2.74 CroreThree-bedroom, three baths, powder room
2,583 sq ftRs. 3.47 CroreFour-bedroom, four baths, powder room
2,936 sq ftRs. 3.94 CroreFour-and-a-half-bedroom (4.5 BHK), four baths, powder room

Across these plans the rate is roughly Rs. 13,400 per sq ft. Phase 3 sizes shift slightly, from 1,260 sq ft for a 2 BHK to 2,980 sq ft for a 4 BHK (five bathrooms). Carpet areas there range between 838 sq ft and 1,910 sq ft.

Over the base price, expect floor rise, car parking, the club fee, stamp duty, GST and a 2% fee for registration. Only a unit-specific cost sheet in writing shows the real total, and the EMI calculator helps estimate the monthly loan payment.

Sports and Amenities

A 2,50,000 sq ft clubhouse on 7 acres anchors more than 125 facilities. About 85% of the land is open space, and the plan calls for more than 3,500 trees of native species. On the sports side:

  • Futsal and a football ground of FIFA dimensions
  • Two squash courts and eight badminton courts indoors
  • Pickleball, basketball and tennis, with five courts for each
  • Beach volleyball, regular volleyball and box cricket
  • A cycling and jogging loop of 4 km around the boundary
  • Children's play zones, swimming pools and a deck for yoga

More than 20 acres go to sport. Every tower has one service lift and three lifts for residents.

Where Construction Has Reached

Construction continues in October 2026. The first phase started in January 2025, and by May 2026 it had risen from the basements to the ground and lower levels. September 2025 saw Phase 2 begin, and July 2026 saw Phase 3 start.

About two years separate the earliest and latest due dates. A Phase 1 flat should be ready in early 2030; a Phase 3 flat, in 2032.

About Nambiar Builders

Active in Bangalore since 2009, Nambiar Builders has focused on the Sarjapur corridor. Its completed projects include the first phase of Nambiar Ellegenza and Nambiar Bellezea. District 25 is the largest apartment development it has taken on.

Before Paying a Booking Amount

A home in a township means a commitment of several years, so work through these:

  • Match the tower with the right phase and RERA number online
  • Confirm the phase's due date and the delay compensation clause in the agreement
  • Request the unit plan with the carpet, balcony and saleable areas
  • Get the complete cost sheet and payment plan linked to construction
  • Ask when the clubhouse opens and what amenities each phase delivers
  • Walk the site to see your tower's progress

Other Sarjapura Road apartments are worth comparing before deciding. Speak to us about available towers and the newest price sheet.

Frequently Asked Questions

What is the lowest price at Nambiar District 25?+
A two-bedroom flat measuring around 1,266 sq ft is the cheapest, at Rs. 1.70 Crore. Three-bedroom flats start from Rs. 2.01 Crore and four-bedroom flats cost Rs. 3.47 Crore upward, plus taxes and charges.
What are the RERA numbers of Nambiar District 25?+
There is one per phase: PRM/KA/RERA/1251/308/PR/100125/007377 for Phase 1, PRM/KA/RERA/1251/308/PR/200825/008011 for Phase 2 and PRM/KA/RERA/1251/308/PR/260526/008686 for Phase 3.
What is the possession date of Nambiar District 25?+
RERA lists 26 January 2030 (Phase 1), 31 August 2030 (Phase 2) and 29 February 2032 (Phase 3).
Which area is Nambiar District 25 in?+
Dommasandra village of Anekal Taluk's Sarjapur Hobli, off Sarjapura Road on the eastern side of the city. Muthanallur, 600 m off, is the site of a proposed metro station.
How many towers and homes does Nambiar District 25 have?+
There are 2,814 homes spread across 20 towers in three phases: six towers in each of the first two phases and eight in the third, with heights of 32 to 38 floors.

Related Reads