Total Environment In That Quiet Earth near Hennur Road: Stages, Sizes and Prices (October 2026)

By Book A Home Editorial Team·26 November 2026·5 min read
Total Environment In That Quiet Earth in Off Hennur Road

Total Environment is building Total Environment In That Quiet Earth, a mix of high-rise flats and villas, on 37 acres in Bileshivale near Hennur Road, North Bangalore. Construction moves in stages, with a distinct RERA registration and deadline for each. This guide takes buyers through the address, the stage-wise dates, approvals, home sizes, prices, fit, the builder and checks.

Address and Travel

The land falls in Bileshivale, a village of Bidarahalli hobli in Bengaluru East taluk, on the eastern side of Hennur Road. The entry is via Avalahalli Main Road, and the area counts as part of the Hennur Road belt, in the stretch between Kothanur, Bagalur Road and Hennur. Hennur Road connects the Outer Ring Road to the south with Bagalur and the airport to the north.

Manyata Tech Park, the nearest major employer, is about 6 km due west as the crow flies. Office campuses at Hebbal and Nagavara on the ring road follow. During the past decade, Hennur Road has gained plenty of shops, hospitals and schools.

The metro's airport Blue Line is under construction beside the ring road, and its planned Nagavara and Hebbal stops are out of walking range from here. Since daily trips use Hennur Road, try it at the busiest hour first.

Five Registrations, Five Deadlines

Karnataka RERA holds five registrations for the project, and the stage a home belongs to sets its number and deadline.

CoversStageFinish on recordRegistered
Four towers, 35 floors eachTowers 1 to 4, the first In That Quiet Earth stage30 September 202619 May 2018
55 villasPhase 2A31 December 20261 October 2020
324 homes, three towers (27 floors)Towers 5 to 7, Phase 2B1 May 20286 July 2022
120 homes, a 29-floor towerTower 9, Phase 2C31 March 20316 April 2024
120 homes, a 29-floor towerTower 831 December 203231 January 2025

The two oldest stages have each been extended once, both from an original 31 December 2025. Towers 1 to 4 now carry 30 September 2026, while the Phase 2A villas carry 31 December 2026. Anyone buying in these stages should find out if the occupancy certificate has come through.

The newer towers will take years, and Tower 8, registered last, runs until the end of 2032. Ask for the tower's planned handover in writing and check it against the RERA deadline.

Approvals on Record

RERA has approved every stage. Tower 8, the final one registered so far, has number PRM/KA/RERA/1251/446/PR/310125/007467, and every earlier stage (Phase 2A, Phase 2B, Phase 2C and the first) has its own. Searching the state RERA site by stage and name confirms any of them.

Total Environment Constructions Private Limited is the promoter, the plan was sanctioned by the Bruhat Bengaluru Mahanagara Palike, and BWSSB will supply the newer towers. Every stage record carries its sanctioned plan, quarterly updates and complaints. Reading it is the surest way to confirm carpet area and car parks.

Terraced Homes and Their Sizes

The towers taper as they rise, so each flat gets a planted terrace of its own, unlike a typical high-rise. Choices span 2 BHK, 3 BHK and 4 BHK flats, plus 4 BHK villas.

A two-bedroom flat is 1,431 sq ft, a three-bedroom is 2,305 sq ft or 2,628 sq ft, and the four-bedroom flat covers 2,890 sq ft. Villas measure 3,430 sq ft. Towers 8 and 9 sell 3 BHK flats only, with RERA carpet areas of about 2,565 sq ft (Tower 8) and about 1,591 sq ft (Tower 9), plus two car parks per home.

Pricing and Charges

Expect close to Rs. 21,000 per square foot, whichever plan is picked. For flats, the ladder begins with Rs. 3.01 Crore and peaks with Rs. 6.07 Crore.

PriceSizeHome
Rs. 3.01 Crore1,431 sq ftTwo-bedroom flat
Rs. 4.84 Crore2,305 sq ftThree-bedroom flat
Rs. 5.52 Crore2,628 sq ftThree-bedroom flat
Rs. 6.07 Crore2,890 sq ftFour-bedroom flat
Ask for price3,430 sq ftFour-bedroom villa

Taking the entry flat at Rs. 3.01 Crore, 5.6% stamp duty (cess and surcharge included) plus the 2% registration fee add up to roughly Rs. 22.88 Lakhs. Homes bought before their occupancy certificate attract GST, which the cost sheet should list.

As an illustration on the same flat, lenders finance no more than 75% of value when the loan is over Rs. 75 Lakhs. The buyer therefore pays Rs. 75.25 Lakhs, or 25%, and borrows the remainder, which at 8.5% across 20 years means an EMI near Rs. 1.96 Lakhs. Our EMI calculator runs other numbers.

Who Will Like It

Families with Rs. 3 Crore and above to spend, wanting a spacious home and garden, are the core buyers. Staff of Manyata Tech Park and the northern ring road offices also benefit. It appeals most to those who rate design and open space higher than the lowest per-square-foot price.

Buyers who need to shift soon should look at the first towers or resales. With less than Rs. 3 Crore to spend, or a liking for a compact block shared with few families, other North Bangalore projects fit better. Those booking Towers 8 or 9 face a long wait.

The Builder

Founded by two architects in 1996, Total Environment, based in Bangalore, both plans and constructs its projects. Brick left exposed, wood and terrace gardens define its homes, and Windmills of Your Mind at Whitefield is among its completed Bangalore work.

The finished towers at this site are the best preview of what is coming. Touring one shows the upkeep of shared spaces, the state of the gardens and the quality of construction.

Paperwork Checklist

Settle each point below before any money changes hands.

  1. Identify the home's stage and registration, then go through that stage's RERA record
  2. Obtain a written handover date for the tower, plus the delay clauses of the agreement
  3. Request the occupancy certificate if the home is a villa or in Towers 1 to 4
  4. Compare the agreement's carpet and terrace areas and car parks with RERA
  5. Insist on a cost sheet covering GST, parking, club charges, maintenance deposit and corpus
  6. Confirm whether the developer is selling directly or an earlier buyer is reselling
  7. Get a lawyer to examine the stage's title deeds and Encumbrance Certificate

Frequently Asked Questions

Has In That Quiet Earth been approved by RERA?+
Yes. All five stages are registered separately with Karnataka RERA. The last to be added, Tower 8, got PRM/KA/RERA/1251/446/PR/310125/007467 dated 31 January 2025.
What is the price of a flat in this project?+
Flats begin with a two-bedroom of 1,431 sq ft at Rs. 3.01 Crore and peak with a four-bedroom of 2,890 sq ft at Rs. 6.07 Crore. Rates are close to Rs. 21,000 per square foot.
Which village is the project in?+
Bileshivale, which belongs to Bidarahalli hobli in Bengaluru East taluk. Entry is from Avalahalli Main Road, which connects to Hennur Road, North Bangalore.
What deadlines apply to each stage?+
Tower 8 has until 31 December 2032 and Tower 9 until 31 March 2031. Towers 5 to 7 must finish by 1 May 2028. The villas have 31 December 2026, and Towers 1 to 4 had 30 September 2026.
How many towers make up In That Quiet Earth?+
RERA lists nine. Towers 1 to 4 rise to 35 floors, Towers 5 to 7 to 27 floors, and both Tower 8 and Tower 9 to 29 floors. The 55 villas belong to Phase 2A.