Sanjeevini Adwaith Apartments in Gunjur, East Bangalore: A Buyer's Guide (October 2026)

Sanjeevini Group is developing Sanjeevini Adwaith, a high-end apartment project in Gunjur on the east side of Bangalore. This article covers buyer fit, prices, RERA status, location, facilities and paperwork.
Buyer Fit
Most homes are spacious 3 BHK apartments, with a smaller share of 4 BHK units, across five towers that go up to 23 floors. The lowest price is Rs. 2.38 Crore. It suits families employed around Sarjapur Road, Whitefield or Marathahalli who want generous space and a large club.
Sales opened in August 2025, and handovers are scheduled from December 2028. Buyers needing to move in under a year, or with a budget below Rs. 2 Crore, should look elsewhere. Anyone after a small low-rise setting should factor in the size of a five-tower campus.
Prices and Home Sizes
The cheapest home, a 3 BHK of nearly 1,930 sq ft, costs Rs. 2.38 Crore, roughly Rs. 12,300 for each sq ft. 3 BHK sizes start at 1,545 sq ft and reach 1,935 sq ft, while availability by size and tower shifts monthly.
Registered carpet areas, counting only usable space inside the walls, are lower:
- 4 BHK homes: 1,633 sq ft
- 3 BHK: a compact plan of 963 sq ft and a larger plan of between 1,237 and 1,239 sq ft
- 1 BHK units: 471-481 sq ft
In all, 704 units are registered: 586 are 3 BHK, 46 are 4 BHK and 72 have one bedroom. Compare on carpet area, and ask for the chosen layout's balcony area separately.
For illustration, loans over Rs. 75 Lakhs are capped at 75% of value, so a home costing Rs. 2.38 Crore needs 25% down and a loan of roughly Rs. 1.78 Crore. With a 20-year term at an 8.5% annual rate, the EMI comes close to Rs. 1.55 Lakhs per month. Beyond the price, the buyer pays 5.6% stamp duty inclusive of cess and surcharge, registration of 2%, GST and deposits, and the EMI calculator covers other loan sizes.
RERA Status
Registration number PRM/KA/RERA/1251/446/PR/140825/007996 dates from 14 August 2025 and was issued by Karnataka RERA. The project appears on the register as "The Adwaith by Sanjeevini", promoted by Sanjeevini Properties Private Limited, and the land is stated to be free of litigation.
The construction start date is 1 July 2025, and completion is registered for 31 December 2028. Each tower was at 12% in January 2026 and reached 26% in the quarterly filing of July 2026. Each quarter's update can be followed through the Karnataka RERA website.
Location and Roads
Gunjur Post, pincode 560087, serves Gunjurpalya Village in the Varthur Hobli of Bangalore East. Its land is Survey No. 116 (sub-numbers 2, 5, 13, 14 and 15) and Survey No. 117 (sub-numbers 6, 7, 9 and 14), with a road along the northern edge. Gunjur is located between Sarjapur Road and Varthur.
Along the Gunjur Road belt, travel heads towards Sarjapur Road in one direction and towards Varthur and Whitefield in the other. Expect narrow sections and heavy rush-hour traffic near Varthur, and test the commute on a weekday morning.
The building plan carries BBMP approval, and BWSSB supply plus borewells are the recorded water sources. Ask how far the BWSSB connection has progressed at booking.
Towers, Land and Amenities
The campus covers 8.3 acres, and registration puts the land at 33,260 sq m, with some 75% left open. There are five towers, each with two basements, and 1,156 covered parking spaces. The registered tower details are:
| Tower | Homes | Floors |
|---|---|---|
| Aarka | 124 | 21 |
| Avani | 145 | 23 |
| Anila | 145 | 23 |
| Aqua | 145 | 23 |
| Aranya | 145 | 23 |
Club Adwaith, a clubhouse spanning 45,000 sq ft, is the hub. Facilities range from an amphitheatre, a pet park and guest rooms to a gymnasium, spa, salon, co-working space and mini theatres, plus a main pool, a kids' pool and several courts for sport. IGBC Gold pre-certification is in place, and the campus plan includes retail spaces.
Paperwork and Site Checks
Registration supplies firm dates and numbers that the developer can be held to. Before paying, cover the following:
- Tally the unit number, tower name and RERA number in the agreement against the registration
- Request written carpet, super built-up and balcony figures for the chosen home
- Obtain the complete cost sheet, noting what the quoted price includes
- Hold the agreement's delay clause and completion date up against 31 December 2028
- Watch the quarterly progress figures: at 26% in July 2026, most construction is ahead
- Visit a finished project of the same developer to see build quality and upkeep
- Request the expected maintenance charge, as central services and a big clubhouse push up monthly costs
The project pairs large homes and a big clubhouse with a clean registration, in an East Bangalore area where tech employees keep demand steady. Price, the December 2028 handover and local road conditions are the factors to weigh. The East Bangalore page lists more homes nearby.