Book A HomeReal Estate Advisory

Eaton Park at The Prestige City: Towers, Prices and RERA Facts (October 2026)

By Book A Home Editorial Team·26 November 2026·6 min read
Prestige Eaton Park

Prestige Group has opened bookings for Prestige City Eaton Park: 366 apartments in four high-rise towers inside its Sarjapur Road township. Only three- and four-bedroom units are offered, and the completion date filed with RERA is 30 June 2030. The sections below explain the registration, the site, the towers and unit plans, the real cost and the checks to finish before paying.

RERA Record and Stage

Karnataka RERA lists the cluster as "Eaton Park @ The Prestige City" under number PRM/KA/RERA/1251/308/PR/180326/008537, issued on 18 March 2026. Prestige Projects Private Limited acts as promoter, and the Anekal Planning Authority sanctioned the plan for the buildings on 5 March 2026.

Officially, building started on 1 April 2026, with a deadline of 30 June 2030. In the quarterly return for July 2026, overall progress was a mere 2%, so work is just beginning. Every return on the state RERA website reports each tower separately.

Fernvale, Eden Park, Avalon Park and Aston Park are other similarly named clusters in this township, each with its own number, towers and timeline. Check that the sale agreement carries the number registered for Eaton Park and a tower shown on its approved plan.

Site and Commute

Land records place the cluster in Valagere Kalahalli and Sompura villages, Anekal Taluk (Sarjapur Hobli), PIN 562125. It forms one parcel of The Prestige City, the 180-acre township near Yamare on the road from Sarjapur to Marathahalli. To the north runs a road of 26 metres, and to the south is a lake.

In one direction, Sarjapur Road carries commuters to Bellandur and Marathahalli on the Outer Ring Road, and in the other to Sarjapur town. Link roads leaving the main road at Dommasandra reach Whitefield and Electronic City. For now every trip is by road, since the Sarjapur Road metro remains planned and this section has no open station.

Rush-hour congestion is severe, so trial the office run before committing. Go at a usual working hour, then return in the evening. Shops, hospitals and schools are dotted along the way to Sarjapur town.

Towers and Unit Plans

The plot is close to 7 acres, or 31,008 sq m on the registration. Three towers stop at 29 storeys with double basements, and the fourth reaches 37 storeys with a triple basement. Units per tower:

TowerUnitsStoreysBasement levels
4112373
187292
285292
382292

A standard level has just three units, keeping each lobby quiet. RERA records 72 open and 366 covered car bays. Tower 4 rises highest at about 116 metres, and the others top out near 92 metres.

The three registered unit types:

  • Standard 3 BHK, three bathrooms: 126 units with carpet of 1,180 or 1,102 sq ft
  • 3 BHK, three bathrooms with study and powder room: 5 units, carpet between 1,321 and 1,355 sq ft
  • 4 BHK, four bathrooms with study and powder room: 235 units, carpet between 1,579 and 1,658 sq ft

With nearly two in every three units being 4 BHK, the cluster mainly serves big families. The saleable figure in sales talk is higher than carpet, because walls, balconies and part of the common area are counted. Since the sale contract is drafted on carpet area, use carpet when comparing.

What You Pay

Entry for a 3 BHK of near 1,903 sq ft is Rs. 2.21 Crore, and for a 4 BHK of near 2,492 sq ft it is Rs. 2.98 Crore. In saleable terms the rates are about Rs. 11,600 and Rs. 12,000 per sq ft respectively. At these heights, extra charges for higher floors and better views raise both prices.

Duty and registration are payable over and above what the agreement states. Stamp duty on property above Rs. 45 Lakhs totals 5.6% after adding cess and surcharge, plus a 2% registration fee, close to Rs. 16.8 Lakhs for a Rs. 2.21 Crore unit. Request a single written total that also covers parking, GST, the club charge and a maintenance deposit.

As an example, lenders fund up to 75% of value on loans over Rs. 75 Lakhs. An entry unit would need 25% upfront, leaving roughly Rs. 1.66 Crore to borrow. Repaid across 20 years at 8.5% per annum, the EMI lands near Rs. 1.44 Lakhs. Test other amounts on the EMI calculator.

Amenities

On top of the township's shared facilities, the cluster has a registered set of its own:

  • A club building of around 17,770 sq ft
  • Pool and fitness centre
  • Community hall
  • Green open space with parks
  • Indoor and outdoor play areas for sports

Buildings cover just a tenth or so of the ground, and the remainder stays open. Since some township facilities serve one cluster and others serve everyone, clarify which are exclusive to this cluster and what maintenance covers each month.

Right for Whom?

Families wanting a three- or four-bedroom home within a large gated township are the core buyers. Pricing beyond Rs. 2 Crore aims at upgraders and senior employees from the Outer Ring Road and Sarjapur Road office belt. Most larger plans include a study, useful for hybrid workers.

Since construction began in 2026, keys are roughly four years off. That means renting and paying instalments together until 2030. Families who need to shift in under two years would be better off with a ready or near-ready project.

About Prestige Group

Prestige Group, a Bangalore-based listed company, has built in Bangalore since 1986. The township on Sarjapur Road is released in clusters of apartments, villas and plots, and Eden Park, one of the earlier apartment clusters, has already been delivered.

Checklist Before Paying

With possession four years out, the paperwork must be tight. Cover these points:

  • Confirm the RERA number in the agreement against this cluster's listing online
  • Record which tower, level and carpet area apply, and cross-check with the approved plan
  • Insist on an all-inclusive breakdown with parking, GST, club, floor rise and deposits
  • Study the payment milestones and the compensation terms for any delay
  • Ask how water will be supplied, since the registration names borewells as the source
  • Check which township facilities are running now and which come later
  • Confirm with two lenders that they will finance units here

The possession date written into the agreement should be 30 June 2030, the same as the registration. Contact us for the newest price list and the units still open in each tower.

Frequently Asked Questions

Is the Eaton Park cluster registered under RERA?+
Yes. Prestige Projects Private Limited holds Karnataka RERA number PRM/KA/RERA/1251/308/PR/180326/008537, issued on 18 March 2026.
What are Eaton Park prices?+
The entry 3 BHK of near 1,903 sq ft costs Rs. 2.21 Crore, while the entry 4 BHK of near 2,492 sq ft costs Rs. 2.98 Crore. Other charges, including GST, duty and registration, are payable on top.
When is possession of Eaton Park due?+
By 30 June 2030, the date on the registration. Construction formally got going on 1 April 2026, with 2% progress reported in the quarterly return for July 2026.
How many units and towers does Eaton Park have?+
There are 366 units in four towers: one of 37 storeys and three of 29 storeys. The split is 235 four-bedroom units and 131 three-bedroom units.
Which area is Eaton Park in?+
Inside The Prestige City, a township near the Sarjapur-Marathahalli Road in East Bangalore. Its villages are Valagere Kalahalli and Sompura, Anekal Taluk (Sarjapur Hobli), PIN 562125.

Related Reads