Book A HomeReal Estate Advisory

Buying at Keya The Urban Forest, Kasavanahalli: Key Facts (October 2026)

By Book A Home Editorial Team·26 November 2026·6 min read
Keya The Urban Forest apartments

In East Bangalore's Kasavanahalli, a locality reached from Hosa Road as well as Sarjapur Road, Keya Homes has started work on Keya The Urban Forest. This article explains who the project suits, where it is, what the homes measure and cost, how far construction had reached by October 2026 and what RERA shows. It closes with the points to settle before paying a booking amount.

Who Should Look at It

The target buyer is a family employed in Electronic City, on Sarjapur Road or along the eastern stretch of the Outer Ring Road that wants a sizeable gated community. Layout choice is widest for 4 BHK and 3 BHK seekers. With entry pricing over Rs. 1.5 Crore, smaller budgets will not fit.

On the registered date, handover is over two years out, so a family that must relocate soon is better off with a ready building. Once every tower is occupied, 727 homes over 8.15 acres will create a big, busy neighbourhood of its own.

Overview Table

The plan places four towers across 8.15 acres, each built as two basements, ground and 24 upper floors, for 727 two-, three- and four-bedroom homes. Main details:

FeatureInformation
BuilderKeya Homes
AreaKasavanahalli, Bangalore 560035
Site8.15 acres
Scale727 homes across 4 towers (full plan)
Floors2B + G + 24
SizesSmallest 1,351 sq ft, largest 2,610 sq ft
Prices begin atRs. 1.70 Crore
RegistrationPRM/KA/RERA/1251/310/PR/200525/007759
Completion on record31 December 2028

That registration dates from 20 May 2025 and applies only to the first two towers, A and B, a total of 391 homes. Further towers need fresh registration before sales open. Check that the flat you pick is in a tower the registration includes.

Area, Roads and Metro

On paper the land belongs to Kasavanahalli village in Varthur hobli, within city corporation limits. To the west of Kasavanahalli is HSR Layout, and the locality is entered from Sarjapur Road or from Hosa Road. Tech parks at Marathahalli and Bellandur are best reached via the ORR junction on Sarjapur Road.

Hosa Road heads south to meet Hosur Road and the Yellow Line, operating since August 2025, which includes a Hosa Road station on its way to Electronic City. Work on the Blue Line along the ring road continues, with an Iblur station planned. For Sarjapur Road, a metro remains a proposal.

Side streets and Kasavanahalli Main Road have tight sections that slow down in rush hour. Though the ORR is near in straight-line terms, morning drives take more time. A 9 am run from the gate to your office is the best location test.

Configurations and Carpet Areas

There are five built-up layouts over three home types. Opening prices by layout:

  • 2 BHK (1,351 sq ft) priced from Rs. 1.70 Crore onwards
  • 3 BHK (1,710 sq ft) priced from Rs. 2.14 Crore onwards
  • 3 BHK Grand (1,910 sq ft) priced from Rs. 2.39 Crore onwards
  • 4 BHK (2,387 sq ft) priced from Rs. 3.0 Crore onwards
  • 4 BHK Grand (2,610 sq ft) priced from Rs. 3.30 Crore onwards

In registered Towers A and B, 246 homes are 3 BHK, 52 are 2 BHK and 93 are 4 BHK. Average carpet areas on the registration are near 880 sq ft for a 2 BHK, 1,160 sq ft for a 3 BHK and 1,655 sq ft for a 4 BHK. RERA treats carpet area as the measure, so it should appear in the agreement for your unit.

This phase has 789 parking bays, all covered, with no open parking. Building height is 74 metres, water comes from the BWSSB on record, and the city corporation gave plan sanction in April 2025.

Budgeting the Purchase

The 2 BHK opens the range at Rs. 1.70 Crore and the 4 BHK Grand tops it at Rs. 3.30 Crore, averaging close to Rs. 12,600 per square foot. Floor level, outlook and allotted parking change each flat's final price, so compare full cost sheets.

Government charges are added on top. Taking the 2 BHK at Rs. 1.70 Crore, 5.6% stamp duty including cess and surcharge works out at around Rs. 9.52 Lakhs, plus Rs. 3.40 Lakhs for 2% registration. An under-construction purchase also carries GST.

For illustration, lenders cap loans over Rs. 75 Lakhs at 75% of value. That home therefore requires a 25% down payment and a loan of around Rs. 1.27 Crore. At 8.5% interest across 20 years, the instalment is nearly Rs. 1.11 Lakhs each month, and other cases can be tried on the EMI calculator.

Clubhouse and Open Spaces

Club Verde is the clubhouse, surrounded by a pool, gym and courts for sports. Towers cover under one-tenth of the land registered, leaving open ground that includes the planted forest zone the name refers to. Highlighted features include:

  • A 4 million litre pond
  • Solar energy generation
  • Charging points for electric vehicles

Facilities in projects with many towers usually arrive in stages. Read together, the RERA filing and agreement reveal which belong to this phase and when each will be ready.

Construction Progress on RERA

Karnataka RERA lists the project under the name "The Urban Forest"; its promoter is Keya Homes. Building began on 15 May 2025, with a registered finish of 31 December 2028. The developer's own target is December 2027, but compensation for delay follows the RERA date.

The most recent quarterly report puts progress at foundation, basement and early structural work. The registration records no litigation on the project or its land. Clearances from the airport authority, water board, power utility and fire department are recorded as received.

A joint development arrangement gives the land owner a 22.4% share, so part of the inventory is the owner's. If buying such a unit, confirm the signatory to the agreement and that money is deposited in the RERA-designated account.

The Builder

Koramangala-based Keya Homes was incorporated in 2013. On the RERA portal its past projects are Life By The Lake, The Green Terraces and Around The Life, and both Life By The Lake and Around The Life are declared completed. Visiting a finished one gives a quick read on workmanship and upkeep.

Points to Settle Before Booking

Settle the following before paying:

  1. Make sure your tower and flat number appear in registration number 007759.
  2. Work out the price per carpet sq ft using the area written in the agreement.
  3. Get possession timing confirmed on paper; the RERA date is 31 December 2028.
  4. Find out if the unit is in the developer's portion or the land owner's.
  5. Learn which facilities, such as the clubhouse, are tied to the registered phase.
  6. Ask if a storm water drain passes close by, and what buffer the approved plan keeps.
  7. Commute to work at rush hour by way of Kasavanahalli Main Road.

Frequently Asked Questions

Which locality is the project in?+
Kasavanahalli, Bangalore 560035, close to Hosa Road as well as Sarjapur Road. The land belongs to Varthur hobli and falls inside city corporation limits.
What are the prices at The Urban Forest?+
Rs. 1.70 Crore buys the 1,351 sq ft 2 BHK, while the 2,610 sq ft 4 BHK Grand costs Rs. 3.30 Crore. Rates average close to Rs. 12,600 per square foot.
Is the project registered under RERA?+
Yes, as PRM/KA/RERA/1251/310/PR/200525/007759, dated 20 May 2025. Towers A and B, with 391 homes, are covered.
What is the possession date?+
Karnataka RERA lists completion for 31 December 2028. The developer's own target is December 2027.
How big is the full project?+
727 homes, spread over four towers across 8.15 acres. Only two towers, holding 391 homes, are under the present registration.

Related Reads