Birla Trimaya Township, Devanahalli: What Buyers Should Know (October 2026)

Close to the Bangalore airport, Birla Estates has planned Birla Trimaya as a 52-acre township in Devanahalli, reached via Shettigere Main Road. It comprises 2,028 homes registered in four RERA phases, and the newest phase opens at Rs. 90 Lakhs. Below: who it suits, costs, phase timing, location and what to verify first.
The Right Buyer
This township is for people who want the airport on their doorstep: airport employees, staff of the surrounding business parks, frequent travellers and NRIs who value a large national developer. Units range from compact investor-sized 1 BHK homes up to 4 BHK duplexes meant for big families.
Registered completion runs from October 2028 out to December 2031, so buyers need patience. Commuting daily to Whitefield, Electronic City or the ORR from Devanahalli is a long haul, best tested at the busiest hour before committing.
Home Types and Entry Prices
Unit prices in the latest release start at Rs. 90 Lakhs and reach Rs. 4.24 Crore for duplexes. Starting prices by layout:
- One-bedroom of approximately 485 sq ft, priced at Rs. 90 Lakhs
- Two-bedroom of approximately 801 sq ft, priced at Rs. 1.34 Crore
- Three-bedroom with three baths, approximately 1,100 sq ft, priced at Rs. 1.75 Crore
- Four-bedroom duplex plus a domestic help's room, approximately 2,551 sq ft, priced at Rs. 4.24 Crore
Per sq ft, the 3 BHK works out near Rs. 15,900 and the 1 BHK near Rs. 18,600. Under the Phase 4 filing, one-bedroom carpet is about 445 sq ft, two-bedroom carpet is 735 sq ft or up to 745, and three-bedroom carpet varies between 963 and 1,084. The chosen unit's carpet area must therefore appear on its cost sheet.
Adding Up the Full Cost
Above Rs. 45 Lakhs, stamp duty comes to 5.6% after cess and surcharge, with registration adding 2%, roughly Rs. 6.84 Lakhs together when the price is Rs. 90 Lakhs. Ask for one written total that also covers GST, the floor-rise charge, parking, club membership and the maintenance deposit.
Here is an illustration. Paying 20% upfront at a Rs. 90 Lakhs price leaves Rs. 72 Lakhs to borrow, and at 8.5% interest over a 20-year term the EMI works out near Rs. 62,500 monthly. Try other amounts in the EMI calculator.
Master Plan and Amenities
About 73% of the township is kept open. Its centrepiece is a water body of around 2.5 acres, with clusters of towers arranged around the green spaces. The plan lists more than 30 amenities in total, including these:
- Clubhouse featuring a gym, an indoor games room and a pool
- Courts for tennis plus other sports
- A rink for skating, and spaces where children can play
- Gardens, a picnic area and jogging tracks along the lake
- In-campus shops for daily needs
Amenities in a phased project open phase by phase, so check which clubhouse and green areas are linked to a given phase and the dates promised. Residents of the first towers feel this most, living on site while the remaining phases are built.
How the Phases Are Scheduled
Each phase has its own RERA registration, towers and deadline. Three cluster names appear in sales material: The Bay, The Hill and The Park, with The Bay being the Phase 4 offering. In brief:
- Phase 1 (544 homes): RERA approval 30 August 2023, completion 31 October 2028; seven 11- and 12-storey towers and a three-floor block
- Phase 2 (473 homes): RERA approval 4 September 2024, completion 20 June 2029; five 12- and 13-storey towers, duplex blocks, row houses
- Phase 3 (463 homes): RERA approval 30 January 2025, completion 31 August 2030; five towers of between 12 and 14 storeys and a three-floor block
- Phase 4 (548 homes): RERA approval 29 January 2026, completion 15 December 2031; seven 14-storey towers
Parking is in one or two basements under these mid-rise towers. In Phase 2, the 9 row houses and 28 duplex apartments in low-rise blocks are the largest homes on offer. Of the 548 Phase 4 homes, 58 have one bedroom, 250 have two, 226 have three and 14 have four.
RERA Numbers and Plan Approvals
Every registration names Birla Arnaa LLP as promoter. The registration numbers are:
- Phase 1: PRM/KA/RERA/1250/303/PR/300823/006200
- Phase 2: PRM/KA/RERA/1250/303/PR/040924/006988
- Phase 3: PRM/KA/RERA/1250/303/PR/300125/007458
- Phase 4: PRM/KA/RERA/1250/303/PR/290126/008436
The airport-area planning authority sanctioned the plans. Phase 1, with a registered start of 1 November 2023, is the most advanced, whereas Phase 4 has 20 November 2026 as its registered start. Quarterly progress filings for every phase are public on the RERA website.
Where It Is and How to Get Around
Property No. 103 on Shettigere Main Road is the formal plot reference. It is in Kasaba Hobli's Akkalenahalli-Mallenahalli village in Devanahalli Taluk, Bengaluru Rural, PIN 562110. Shettigere village borders it to the south. The airport at Kempegowda is the closest landmark, reached by a road looping around its perimeter.
Getting around relies on:
- Bellary Road (NH 44), carrying traffic from the airport zone towards Hebbal and the city
- Prestige Tech Cloud, an IT park at a distance of 2.5 km
- Shettigere Main Road, the link from the highway to the project
- The airport-bound Blue Line metro, still under construction, which plans a Doddajala stop on Bellary Road
Devanahalli town has the hospitals, schools and larger retail, as does the Bellary Road stretch to Yelahanka, while a mall is planned at a distance of 2 km. The metro is the key piece of infrastructure still awaited, and road travel is the only option until it runs.
Developer Background
As the Aditya Birla Group's real estate business, Birla Estates is active in Pune, Mumbai, the NCR and Bangalore. Birla Tisya, Birla Alokya, Birla Evara and Birla Ojasvi are among its Bangalore developments. The company is wholly owned by Aditya Birla Real Estate, which is listed.
Pre-Booking Checklist
Buying into a township released in phases warrants extra care:
- Establish the phase and tower, then look up that phase's registration with RERA
- Check that the agreement for sale uses the same completion date as the registration
- Request an itemised quote with the carpet area, deposits, parking, the floor-rise charge and GST
- Review the most recent quarterly filing to see what stage the tower has reached
- Find out which amenities belong to that phase and their opening timeline
- Test the office commute at rush hour, both when airport traffic is heavy and when it is light
- Ask two banks if they have approved the phase for home loans
For the current release, go to Birla Trimaya Phase 4 on this site. Get in touch for an updated price list and which homes remain in each phase.



