Buying at Assetz Canvas and Cove, Begur: Phases, Prices and Checks

Beside Begur Lake in South Bangalore, a short way off Hosur Road, Assetz Property is developing Assetz Canvas and Cove as a two-phase apartment community. Its 1,340 homes occupy about 17 acres and fall under four RERA registrations. This guide covers progress, sizes, prices, costs and the questions to settle before booking.
Location and Access
The address is Begur Village, 560068, part of Begur Hobli in Bangalore South Taluk. Phase 1 is built on Survey Nos. 150, 149/7 (part), 149/6, 149/5, 149/4, 149/3 and 149/1, and Phase 2 on Survey Nos. 134/3, 133/1 and 134/1. Begur Lake is the western boundary and a public road the eastern one.
Exits are via Hosur Road or Begur Road. It is 6.1 km by road to Electronic City and 4.1 km to the closest metro station, Singasandra. Since August 2025, Namma Metro's Yellow Line has run between Bommasandra and RV Road. Frequent flyers should note the 48 km trip to the airport, which is on the other side of Bangalore.
Registrations, Land and Promoter
Each part has its own number, home count and date, and the part the agreement names sets the binding deadline:
| RERA number | Wings or blocks | Homes | Height | Phase | Due |
|---|---|---|---|---|---|
| PRM/KA/RERA/1251/310/PR/200702/003480 | Wings C and D | 450 | Two wings | Phase 1 | Occupancy certificate granted 7 August 2025 |
| PRM/KA/RERA/1251/310/PR/251023/006347 | Wings A and B | 273 | 15 floors each | Phase 1 | 30 April 2027 |
| PRM/KA/RERA/1251/310/PR/071223/006454 | Blocks B and C | 373 | 25 and 20 floors | Phase 2 | 31 October 2028 |
| PRM/KA/RERA/1251/310/PR/020824/006955 | Block A | 244 | 28 floors | Phase 2 | 30 April 2029 |
The promoter on record for every part is APG Habitat Private Limited. Phase 1 spreads 723 homes over four wings across 29,592 sq m, close to 7.3 acres. Phase 2, next door, has three taller blocks holding 617 homes on 38,546 sq m (close to 9.5 acres).
Progress on Site
Construction is over at Wings C and D in Phase 1. Their occupancy certificate, dated 7 August 2025, takes in Wing D (240 homes), Wing C (210 homes) and the clubhouse, so residents can move in.
The July 2026 quarterly updates showed Block A at 62%, Blocks B and C at 73%, and Wings A and B at 85%. Most of those homes were already sold by then, so few floors and facings remain to pick from.
Is It the Right Project?
Buyers employed in Electronic City or on the Hosur Road stretch, who want a sizeable gated community with open land between towers, are the natural audience. Phase 1 holds the smaller units, including studios and compact three-bedroom flats. Phase 2 is chiefly bigger 3 BHK homes plus a handful of studios. Anyone who needs to move soon should begin with the completed wings, because the other parts fall due across April 2027 to April 2029.
Sizes and Prices
Wings A and B of Phase 1 contain 152 two-bedroom flats with carpet areas from 638 sq ft up to 687 sq ft. Their 89 three-bedroom flats measure from 806 sq ft up to 836 sq ft, and the wings also include 31 studios and a solitary 1 BHK.
Assetz Canvas and Cove Phase 2 offers three 3 BHK options:
- Rs. 1.85 Crore upwards: two bathrooms, near 1,505 sq ft
- Rs. 2.84 Crore upwards: an attached studio, near 2,345 sq ft
- Rs. 2.27 Crore upwards: three bathrooms, near 1,895 sq ft
On these areas the rate is near Rs. 12,000 to Rs. 12,300 a sq ft. A Phase 2 3 BHK has a registered carpet area between 1,044 sq ft and 1,281 sq ft, while a studio measures near 277 sq ft. Together, Blocks B and C hold 331 three-bedroom flats and 42 studios.
Charges and a Loan Illustration
The cost sheet figure is where the total begins. For a home still being built, expect these extras:
- GST at 5% of the agreement value
- Registration at 2% of the property's value
- Stamp duty for homes above Rs. 45 Lakhs, at 5% or 5.6% with cess and surcharge
- Premiums for preferred location and floor rise, where charged
- The maintenance deposit, clubhouse charges and car parking
To illustrate with the entry 3 BHK, a 25% down payment means a loan near Rs. 1.39 Crore is needed, as lenders fund no more than 75% of value once a loan passes Rs. 75 Lakhs. Repaid over 20 years at an 8.5% yearly rate, the EMI is near Rs. 1.2 Lakhs monthly, and our EMI calculator runs other scenarios.
Open Space and Facilities
The master plan leaves close to 85% of the site open and lines the buildings along the water's edge. Phase 2 will add a 2,130 sq m clubhouse (close to 22,900 sq ft) and parks covering 8,000 sq m. Phase 1 has a separate clubhouse, completed alongside Wings C and D.
Shared facilities include a swimming pool, a gym, indoor sports rooms and outdoor courts. There are also gardens with a jogging path, a community hall, rainwater harvesting and on-site sewage treatment. Homes come with motion-sensor lights and gas leak detectors. The plans were sanctioned by BBMP, and both phases are on BWSSB water.
Assetz Property
Assetz Property, set up in 2006, builds row houses, apartments and plotted developments in Bangalore's north, south and east. Its completed wings at Canvas and Cove offer a look at the quality and maintenance of its homes before anyone books in a later part.
Questions to Settle Before Booking
With four registrations in play, a few extra checks apply:
- Find out the home's phase, wing or block, and look it up on the state RERA portal
- Have the agreement carry a completion date consistent with that part's registered date
- Ask for the chosen flat's carpet area, because quoted sizes are the larger saleable figures
- Insist on a cost sheet with every charge itemised
- Inspect build quality, the clubhouse and the lakeside in Wings C and D
- Check which facilities the two phases share
- Test the commute during peak traffic
Each payment belongs only in that part's RERA-designated bank account. Reach out to us to check what is available or to book a site visit.