
Brigade Altius
Brigade Altius is a luxury high-rise apartment project by Brigade Group on Old Mahabalipuram Road (OMR) in Sholinganallur, Chennai. Its three towers climb to 43 floors on a site of about 6.5 acres and hold 662 homes. A connecting bridge at terrace level links one tower to the next.
Construction of the Sholinganallur towers is under way, and the Tamil Nadu RERA completion date is 31 December 2031. The homes are 3 BHK and 4 BHK apartments, with a study or maid's room option and 4 BHK duplexes. Super built-up sizes start at 1,726 sq ft and reach 5,054 sq ft, and prices begin at Rs. 2.03 Crore.
Brigade Altius at a glance
The main figures for the project are gathered below.
- Land area: about 6.5 acres (26,487 sq m) in Sholinganallur village
- Towers: 3, rising to 43 floors above two basements and a stilt level
- Homes: 662 apartments
- Home types: 3 BHK, 3 BHK with study or maid's room, 4 BHK and 4 BHK duplex
- Super built-up area: 1,726 to 5,054 sq ft
- Starting price: Rs. 2.03 Crore for a 3 BHK
- Car parking: 1,328 covered spaces and 84 for visitors
- RERA number: TN/29/Building/0020/2025
- Completion date: 31 December 2031
What shapes the design
Height is the main idea behind Brigade Altius, which places its homes in three tall blocks on one compact city site. Parking fills the lower levels, and most apartments begin at the seventh floor, well above the traffic on OMR. Shared facilities are gathered on the podium levels, and the bridge adds a walk across the top of the buildings.
Who is the project meant for?
Households that work along the OMR technology belt will find the address practical, because several IT parks are in the same part of the city. Larger families have the 3 BHK with an extra room and the 4 BHK formats to choose from. Buyers planning a loan can test a monthly figure on our EMI calculator before they visit.
Project Highlights
Brigade Altius Exclusive Price
| Unit Type | Size (SBA) | Approx. All Inclusive Price |
|---|---|---|
| 3 BHK | 1726 Sq.ft | Rs. 2.03 Crore |
| 3 BHK + Study / Maid's Room | 2109 Sq.ft | Rs. 2.68 Crore |
| 4 BHK | 2545 Sq.ft | Rs. 3.28 Crore |
| 4 BHK Duplex | 4064 Sq.ft | Rs. 7.58 Crore |
The final figure depends on tower, floor, facing and unit. GST, stamp duty and registration are extra.
Brigade Altius Price Details
Brigade Altius prices start at Rs. 2.03 Crore for a 3 BHK of 1,726 sq ft and reach Rs. 7.58 Crore for a 4 BHK duplex of 4,064 sq ft. Two more formats are priced between them. The rate per sq ft on super built-up area differs from one format to the next.
Price by home type
Each priced format, with its size and working rate, is set out below.
- 3 BHK, 1,726 sq ft: Rs. 2.03 Crore, about Rs. 11,760 per sq ft
- 3 BHK with study or maid's room, 2,109 sq ft: Rs. 2.68 Crore, about Rs. 12,710 per sq ft
- 4 BHK, 2,545 sq ft: Rs. 3.28 Crore, about Rs. 12,890 per sq ft
- 4 BHK duplex, 4,064 sq ft: Rs. 7.58 Crore, about Rs. 18,650 per sq ft
What changes the final figure
The floor, tower, facing and exact size of an apartment all have a bearing on what a buyer finally pays, which matters more than usual in a 43-floor building. GST on an under-construction home, stamp duty and registration charges come on top. Ask for a written cost sheet for a specific unit, so that every charge appears in one place before any booking amount is paid.
Payment plan and maintenance
The payment schedule and maintenance rates for Brigade Altius are being finalised for publication, and we will share them as soon as they are confirmed. The Tamil Nadu RERA registration names ICICI Bank for the project account. Home loan terms depend on the lender and on each applicant's income and credit record, so compare more than one offer.
Location
Door No. 295, Rajiv Gandhi Salai (OMR), Sholinganallur Village and Taluk, Chennai 600119
Landmark: On OMR, near ELCOT SEZ
Brigade Altius is located at Door No. 295, Rajiv Gandhi Salai (OMR), in Sholinganallur, Chennai 600119. The land falls in Sholinganallur village and taluk of Chennai district. It covers Survey Nos. 476/14, 476/15, 476/16A1, 476/17B1A1A, 476/17B1B, 476/24A1, 476/25A1 and 476/32, which are useful to match with the land papers.
Position on the OMR corridor
Rajiv Gandhi Salai is the long road that carries much of the technology employment in southern Chennai. Sholinganallur is one of its busiest points, with routes running north towards Perungudi and across to East Coast Road (ECR). An address directly on this road keeps both of those directions within easy reach for daily travel.
Roads and metro
OMR is the main approach to the site, and ECR gives a second north to south route closer to the coast. A metro station at Sholinganallur is planned as part of Chennai's metro expansion, and it is the closest station to the project. Check the current progress of the line before you count on it for a daily commute.
Offices and IT parks nearby
The technology campuses of the OMR belt are a main reason people look for homes on this stretch.
- ELCOT SEZ IT Park
- SIPCOT IT Park
- Chennai One Software Park
- RMZ Millenia Business Park
- Brigade World Trade Center
Schools and colleges
Families will find both schools and higher education in the wider area.
- Gateway International School
- Babaji Vidya Ashram
- Velammal New Gen School
- Sishya OMR School
- Sathyabama University
- Jeppiaar Engineering College
- St. Joseph's College of Engineering
Hospitals and shopping
Medical care, malls and weekend places in the surrounding areas include the names below.
- Gleneagles Hospital
- Apollo Speciality Hospital
- Chettinad Health City
- Dr. Kamakshi Memorial Hospital
- Vivira Mall, BSR Mall and Marina Mall
- ECR Beach and DakshinaChitra
Checking your own commute
Travel time on OMR changes sharply between a quiet afternoon and the evening office rush, so a single estimate says little. Drive your own route to work or school at the hours you would normally travel. Note the turn into the site from your direction as well, since a median or a U-turn can add several minutes to each trip.
Master Plan
Brigade Altius master plan covers about 6.5 acres with three residential towers and a separate clock tower 30 m high. The residential blocks share an extended double basement and a stilt level used for parking. The first to third floors above them are also given to cars.
Tower by tower
The approved plan divides the 662 homes almost evenly between the three blocks.
- Tower 1: 226 apartments, with 216 of them from the 7th to the 43rd floor
- Tower 2: 219 apartments, with 216 of them from the 7th to the 43rd floor
- Tower 3: 217 apartments, with 207 of them from the 7th to the 43rd floor
Podium levels
The fourth floor works as the main activity level, where indoor sports and social rooms are spread between the towers along with a few homes. Tower 2 has a double-height space for shared use at the fifth floor. Above them, the sixth floor opens out as a podium, with a small number of apartments in each block at the same height.
The bridge between the towers
A connecting bridge 5.05 m wide runs from Tower 1 to Tower 2 and on to Tower 3 at the terrace floor, 143.35 m above the ground. It is the feature that sets the skyline of the project apart. Rules on access hours and safety for a space at that height are worth asking about when you visit.
Parking and approvals
The approved plan provides 1,328 covered car spaces and 84 visitor spaces, which works out to about two covered spaces for each home. The Chennai Metropolitan Development Authority issued the planning permission in December 2024, and the Greater Chennai Corporation issued the building permit the same month. The plan also includes a small shop area of 95 sq m.
Floor Plans
| Unit Type | Size (Sq.Ft) |
|---|---|
| 3 BHK | 1726 Sq.ft |
| 3 BHK + Study / Maid's Room | 2109 Sq.ft |
| 4 BHK | 2545 Sq.ft |
| 4 BHK Duplex | 4064 Sq.ft |
Brigade Altius floor plans cover 3 BHK and 4 BHK apartments, including duplex homes, with super built-up areas from 1,726 to 5,054 sq ft. The range begins well above the size of a compact city flat. Larger households therefore have several steps to move through as their space needs and budgets rise.
Priced formats and sizes
The table shows the four formats that carry a published price.
| Home type | Super built-up area |
|---|---|
| 3 BHK | 1,726 sq ft |
| 3 BHK with study or maid's room | 2,109 sq ft |
| 4 BHK | 2,545 sq ft |
| 4 BHK duplex | 4,064 sq ft |
Choosing between the 3 BHK plans
The 1,726 sq ft plan is the entry point to the project and suits a family that needs three bedrooms without an additional room. Moving up to 2,109 sq ft adds 383 sq ft and the study or maid's room. That space can serve as a home office for someone who works from home on some days of the week.
4 BHK and duplex homes
The 4 BHK of 2,545 sq ft is the next step up and adds a fourth bedroom for a larger household. A duplex spreads the home over two levels, and the priced 4 BHK duplex measures 4,064 sq ft. The overall range reaches 5,054 sq ft, so ask for the sizes and prices of any larger layouts that are still open.
Reading a plan before booking
Super built-up area includes a share of lobbies, stairs and other common space, so the usable room inside a flat is smaller. Ask for the RERA carpet area of the exact unit, along with the balcony sizes, the tower and the floor. Compare the view and facing on the site plan too, because they differ between the three towers. We can send the unit plans on request.
Amenities
Brigade Altius amenities centre on a podium clubhouse of 50,000 sq ft, backed by an open swimming pool and a gym. Indoor courts and social rooms are grouped on the raised podium levels. The approved plan places most of them on the fourth floor, away from the ground-level driveways.
Sports and fitness
Residents get a mix of court games, table games and exercise space.
- Open swimming pool on an open terrace
- Gym and spa
- Badminton court
- Squash court
- Futsal court
- Table tennis room
- Billiards
Social and everyday spaces
The rooms below cover gatherings, leisure and a few daily needs.
- Banquet hall and multipurpose hall
- Indoor games with an AV room
- Business centre
- Association room
- Change rooms and a shop
- Play area for children
- Pet park
- Landscaped gardens
- Security room
How the shared spaces work in daily life
With the pool, courts and hall gathered close together, an evening swim or a game of badminton needs no travel across the city. The business centre gives residents a place to take a call or finish work outside the apartment. Ask which facilities carry a booking fee, when each one opens and when the clubhouse is due to be handed over.
Gallery
About Chennai
Chennai, the capital of the state of Chennai, is one of India's most established metropolitan cities and a major hub for real estate investment. Known for its strong economic foundation, excellent infrastructure, and thriving IT, automobile, healthcare, and manufacturing sectors, Chennai continues to attract homebuyers, investors, and businesses from across the country. Historically, Chennai…
Read more about Chennai →Brigade Altius RERA and Approvals
Brigade Altius RERA registration number is TN/29/Building/0020/2025, granted by the Tamil Nadu Real Estate Regulatory Authority on 10 January 2025. Brigade Enterprises Ltd is the registered promoter. The registration covers the whole project of three towers and 662 homes, and the number can be checked on the TNRERA portal.
Registered details
These entries are useful to compare with any sale document.
- Promoter: Brigade Enterprises Ltd
- Project completion date: 31 December 2031
- CMDA planning permission: CMDA/PP/HRB/S/0367/2024, dated 16 December 2024
- Greater Chennai Corporation building permit: CEBA/WDCN15/00616/2024, dated 24 December 2024
- Project bank: ICICI Bank
Clearances on file
The registration file carries an environment clearance, a fire department clearance, a Public Works Department certificate, and clearances from the Airports Authority of India and the Air Force. For a building of this height, the aviation clearances deserve a careful look. Your lawyer can read them together with the title, the encumbrance certificate and the draft agreements.
Why the completion date matters
The registered completion date is the one to hold the promoter to, and your sale agreement should be read against it. Quarterly progress reports filed with Tamil Nadu RERA help buyers compare the work on the ground with that timeline. Before paying, confirm that the name, tower and unit on your documents match the registered project.
Brigade Altius Construction Status
Brigade Altius construction status is under construction as of November 2026, with slab work moving upwards on all three towers. The structure is still in its lower floors compared with the final height of 43 floors. A sewage treatment plant was also being built during this period.
Progress in October 2026
The position of each part of the work in October 2026 was as follows.
- Tower 1: 6th floor slab in progress
- Tower 2: 5th floor slab completed
- Tower 3: 4th floor slab in progress
- Sewage treatment plant: work in progress
Timeline to completion
The towers have many floors still to rise, and walls, services, finishes, lifts and the bridge at the top come with or after that work. The Tamil Nadu RERA completion date of 31 December 2031 covers the whole programme. If your payments are linked to construction stages, match each demand with the stage actually reached on your own tower before releasing money.
Planning a site visit
A visit shows how far the structure has come and how the road outside behaves at different times of day. Ask the team which tower your preferred home is in and what its latest completed slab is. We can arrange a visit and send the current price details and unit plans for Brigade Altius before you go.
Frequently Asked Questions
Where exactly is Brigade Altius?
What is the Brigade Altius RERA number?
What is the starting price at Brigade Altius?
When will Brigade Altius be completed?
How many towers and homes does Brigade Altius have?
Which home sizes does Brigade Altius offer?
Does Brigade Altius have a bridge between its towers?
Which metro station is closest to Brigade Altius?
What are the main amenities at Brigade Altius?
How much parking does Brigade Altius provide?
About the Builder

Est. 1986
Brigade Group is one of India's most prominent real estate developers, recognized for its excellence in residential, commercial, retail, hospitality, and mixed-use developments. Established in 1986 and headquartered in Bengaluru, the company has played a significant role in shaping the urban landscape of South India through innovative projects, quality construction, and customer-centric…
Similar Projects
ONGOINGCeleste At Godrej Garden City
Jagatpur, Ahmedabad
by Godrej Properties
Celeste At Godrej Garden City is a Godrej Properties apartment project in Jagatpur, Ahmedabad, with 2,132 homes on 11.06 acres. The 2 and 3 BHK apartments start at Rs. 61.00 Lakhs, and the registered completion date is 10 July 2027.
ONGOINGSun Valley by BramhaCorp
Bavdhan, Pune
by BramhaCorp
Sun Valley by BramhaCorp is an apartment project under construction in Bavdhan, West Pune, with 2 to 4.5 BHK homes of 801 to 2,129 sq ft. Prices start at Rs. 1.06 Crore, and possession of Phase 1 is planned for December 2030.
READY TO MOVEBirla Vanya
Kalyan, Mumbai
by Birla Estates
Birla Vanya is a ready-to-move Birla Estates apartment project on Murbad Road, Shahad, Kalyan West, with 1 to 4 BHK homes from Rs. 55.5 Lakhs on 21.05 acres, 70% of it open space.
NEW LAUNCHBirla Evam
Manjari Road, Pune
by Birla Estates
Birla Evam is a new Birla Estates apartment project at Manjari Budruk, Pune East, planned on 16.5 acres with 68.7% open space. 2 and 3 BHK homes start at Rs. 83.99 Lakhs in four high-rise towers.
ONGOINGBirla Pravaah
Sector 71, Gurugram
by Birla Estates
Birla Pravaah is an under-construction Birla Estates apartment project in Sector 71, Gurugram, with 492 homes in five towers on 5.075 acres. 3 and 3.5 BHK homes are priced from Rs. 3.26 Crore, with HRERA completion due in March 2032.
ONGOINGBirla Navya
Sector 63A, Gurugram
by Birla Estates
Birla Navya is a low-rise Birla Estates township off Golf Course Extension Road in Sector 63A, Gurugram, planned across 47+ acres in five pockets. 3 and 4 BHK independent floors start at Rs. 3.34 Crore, with Avik Phase 1 due in April 2027.
