Defects After Possession: Your Five-Year RERA Protection as a Bangalore Flat Owner

Taking possession of a Bangalore flat does not end the builder's obligations. For five years afterwards, the law lets an owner demand repairs for faults that were built into the property. This article explains the rule, the kinds of fault it reaches, the paperwork that makes a claim succeed and the routes open when a promoter stays silent.
The Short Answer
Section 14(3) of the 2016 RERA law contains the rule. When an allottee reports a fault within five years of taking possession, the promoter must rectify it at its own cost. The deadline is 30 days from the report, and compensation becomes payable if the promoter lets it pass.
Faults are grouped under structure, workmanship, quality and services. A fifth group picks up any other duty the promoter accepted in the agreement for sale.
Because that last group refers to the agreement, whatever it says about specifications, fittings and amenities is enforceable. A flat that differs from its description, where the gap is noticed in time, has to be corrected by the promoter.
Dating the Cover
Handover day starts the five years, while booking, the agreement and registration dates play no part. Most owners prove the date with the possession letter, so keep it with the other title papers. Also keep any letters from a period when possession was held up after the builder had offered it in writing.
A later purchaser is not left out. The Act treats a buyer by sale or transfer as an allottee, so resale owners get whatever period remains. A flat that has completed three years offers two more. Lifts, terraces, basements and external walls count, and the owners' association usually speaks for complaints about them.
Sorting Faults by Cause
Covered items are not listed anywhere, so the origin of a fault decides the question. A fault rooted in architecture, material quality or the build method is the promoter's to pay for. One caused by the owner's habits or later alterations is the owner's.
| Fault | Likely cause | Who fixes it |
|---|---|---|
| Cracks running through pillars or floor slabs | Construction | Promoter |
| Seepage in walls, roof or bathroom floor | Waterproofing that failed | Promoter |
| Faulty wiring or pipes concealed in walls | Construction | Promoter |
| Floor tiles that sound hollow, plaster coming off | Workmanship | Promoter |
| A lift, pump, sewage plant or fire system that does not perform as promised | Services provided | Promoter |
| Leak after pipes or walls were altered | Owner's changes | Owner |
| Marks from daily use, misuse, repainting, personal appliances | Owner's use | Owner |
Fit-out is the common battleground. A promoter may claim that a leak began after the owner's contractor cut into masonry or shifted a pipe. Dated pictures taken before any such work begins settle that point most easily.
Records to Create and Keep
The 30 days start counting when the promoter is informed. A word spoken on site leaves no proof, so a written complaint is necessary, and it often brings quicker action as well.
Begin with dated photos or a short clip of the fault, and a note of where it is. Email the complaint to the address the promoter registered, and post a copy by registered mail. The letter should name the fault, give the handover date and cite section 14(3) in asking for repair.
Preserve the acknowledgement, any reference number and each reply. When the repair team visits, write down the date and the work done. If the fault comes back, complain again so that the file shows a pattern.
Acting early helps for two reasons. Tracing a fault back to construction is simpler when it is raised promptly than when it is left for years. After the fifth year, a report no longer qualifies, whatever the seriousness.
What Counts as a Proper Repair
After notice, the promoter has 30 days to remove the fault and may not charge the owner. Curing means dealing with the cause, so hiding a damp wall under fresh paint does not satisfy the duty. A fault whose cause is in a shared area, such as the roof of the building, must be repaired at that source.
Some promoters offer a one- or two-year warranty of their own. It supplements the statutory cover and cannot cut it down. The model sale agreement that Karnataka issued in 2020 states the five-year duty again, in its own clauses.
Going to the Regulator
An owner whose notice is ignored can complain to the Karnataka regulator under section 31. Complaints are filed online, on Form N, against a Rs. 1,000 fee. The relief usually sought is a direction to complete the repair within a stated time.
Compensation is dealt with separately. An adjudicating officer decides it under section 14, with section 71 as the source of power, based on the loss caused. An owner who paid for the repair personally should retain the contractor's invoices and an engineer's opinion to support the amount.
A complaint gains strength from the possession letter that shows the date and from the agreement with its specifications. Dated pictures and copies of every notice help, along with the promoter's replies and records of repairs that failed. For serious faults, add a report from a structural or civil engineering expert.
Consumer commissions are another forum, since the Act keeps other remedies alive. For faults in shared areas, an association may file for every owner and share the cost of experts.
Exceptions and Limits
The section applies only to projects under RERA. A plot of up to 500 sq m, or a scheme of eight apartments at most, needs no registration, so buyers there fall back on their agreement and consumer law. A project whose completion certificate is older than 1 May 2017, when the Act began, also stays outside.
The right turns on notice given within the five years, and repairs or complaints may continue beyond that point. Having an independent engineer inspect the flat in year five is a wise step, since concealed faults then surface during the promoter's liability.
Starting Well
A careful handover supports the whole warranty. Ask someone from the promoter's side to sign a snag list. It shows the condition of the flat on possession day, and items left open on it move directly into the liability period.
Waterproofing and outer walls face their sharpest test in the first two monsoons. Owners who check ceilings, window frames and bathrooms after a heavy downpour spot seepage early. Anyone weighing several projects can ask our team about how a developer handled past handovers, via the contact page.