Ramky One Karnival Electronic City: Prices, RERA and Progress (October 2026)

This guide covers Ramky One Karnival, a two-tower residential community in Electronic City Phase 1 from Ramky Estates, where most of the work is now finished. The 503 apartments are spread in 14-storey blocks on a 7.17-acre site, and pricing for the 2 and 3 BHK units begins at around Rs. 82 Lakhs. It runs through cost, unit sizes, the neighbourhood, the RERA record and progress, buyer fit, amenities and booking checks.
Cost of an Apartment
Pricing begins at around Rs. 82 Lakhs, which buys a 2 BHK measuring 1,105 sq ft. For a 3 BHK measuring 1,355 sq ft, the price begins near Rs. 99.4 Lakhs, while the largest 3 BHK apartments touch around Rs. 1.03 Crore. That is a saleable-area rate in a band from Rs. 7,300 a sq ft up to Rs. 7,400.
The figure for an actual unit depends on its floor, its orientation and its parking. Contact us for an up-to-date price list along with the cost sheet for the apartment you like, which details base price, floor rise charges, the maintenance deposit and GST where relevant.
Government levies are added to the agreement value. Karnataka's stamp duty above Rs. 45 Lakhs is 5%, or 5.6% inclusive of cess and surcharge, and registration costs 2%. An apartment priced Rs. 82 Lakhs therefore carries Rs. 4,59,200 of duty plus a Rs. 1,64,000 registration fee.
For illustration only, a 20% down payment on that Rs. 82 Lakhs apartment means a Rs. 65.6 Lakhs home loan. Repaid over two decades (20 years) at an 8.5% interest rate, the instalment is around Rs. 56,930 per month; try your own numbers on our EMI calculator.
Unit Mix and Sizes
Of the 503 apartments, 349 are 2 BHK and 154 are 3 BHK, with saleable areas of 755 sq ft at the low end and 1,470 sq ft at the top. Above a basement and ground level, each tower rises 14 floors. Plan sizes available:
| Type | Plan Sizes (sq ft, saleable) | Carpet Area (sq ft, approx.) |
|---|---|---|
| 2 BHK | 1,235 / 1,105 / 1,055 / 1,035 / 755 | between 520 and 804 |
| 3 BHK | 1,470 / 1,420 / 1,355 / 1,275 | between 840 and 974 |
The carpet figures are as registered with RERA. Since the sale agreement specifies carpet area for each apartment, use that number when weighing one project against another.
Out of a 29,036 sq m site, the footprint of the two buildings is 4,115 sq m, leaving close to 86% of the ground uncovered. The density is around 70 apartments per acre, given 503 units on 7.17 acres.
Neighbourhood and Transport
The land on record is survey numbers 36 to 40 in Maragondanahalli Village, which belongs to Anekal Taluk of the Bengaluru Urban district. That puts it in Electronic City Phase 1, postal code 560100. Traffic heads to Silk Board and beyond, into the south of the city, via NH 44 (Hosur Road) and the elevated expressway over Electronic City.
Since August 2025, the Yellow Line of Namma Metro between RV Road and Bommasandra has served Electronic City; it connects with the Green Line at RV Road, and from there with other lines. For journeys towards Tumkur Road or Mysore Road, NICE Road can be joined from Electronic City.
Close to the project are:
- Offices: Siemens, HCL, Biocon, Tech Mahindra, Infosys, TCS and Wipro campuses
- Education: Delhi Public School, Ebenezer, Treamis and Vibgyor High
- Healthcare: Motherhood, Sparsh, Narayana Hrudayalaya and Cloudnine
- Hospitality: Ibis, The Oterra and Lemon Tree
Peak hours bring congestion on Hosur Road, and the project is reached through internal streets. Time a test drive to your office in the morning rush for a realistic picture.
RERA Status and Timeline
Ramky Estates and Farms Limited, the promoter, holds Karnataka RERA number PRM/KA/RERA/1251/308/PR/200226/003306, dated 26 February 2020. The Bangalore Development Authority sanctioned the plans, and the registration is searchable on the Karnataka RERA website.
Construction got under way in March 2020, initially due to finish by 31 March 2025. A Covid-related extension took it to 31 December 2025, and a second extension, cleared on 18 March 2026, set 30 December 2026 as the deadline.
The July 2026 quarterly update records 97% progress overall, with Building A complete (100%) and Building B at 97%. A partial OC is also on record, which means possession is being given block by block.
At that update, 389 apartments were booked and 114 of the 503 remained, 91 of these in Building B. Two complaints from buyers are listed against the project, including one claiming compensation for delay.
Is It Right for You?
Professionals employed at the tech parks of Electronic City who value a quick commute are the obvious buyers. Couples and small families looking for a first 2 BHK below Rs. 1 Crore are well served, while the 3 BHK option adds a bedroom without moving into a much higher price bracket.
Being near completion, it also works for those unwilling to wait years for possession. A community of 503 families does mean shared lifts, pool and parking. If you prefer a smaller society or need over 1,470 sq ft, explore other projects in Electronic City.
Amenities
A clubhouse with a gym (air-conditioned) and a multi-use hall is the centre of the amenities, and outdoor facilities occupy the space between the two towers:
- Pool
- Half court for basketball and a tennis court
- Small-format soccer area
- Track for jogging
- Open-air gym
- Table tennis tables
Booking Checklist
Near-complete projects let you inspect the actual apartment, its outlook, the lifts and the club before committing. Before paying any booking money, cover these points:
- Occupancy certificate: confirm the buildings and floors the partial OC applies to and that your apartment is among them.
- Handover: if the unit is in Building B, ensure the possession date is written into the sale agreement.
- Ownership: because the land is covered by a JDA (joint development agreement), establish whose share, developer or landowner, your apartment is in.
- Carpet area: the agreement's figure should equal the RERA figure for that unit number.
- Payments: route all money only to the RERA-listed bank account of the project.
- Financing: make sure your bank has cleared this project and the building concerned.
- Khata and tax: check where the apartment's e-khata stands and the likely registration date.
More projects from this builder are on the Ramky Estates page. Comparing two or three of them on a site visit helps put the price in context.