Prestige Evergreen at Raintree Park, Varthur Road: Homes, Prices and RERA (October 2026)

Prestige Group's newest apartment launch on Whitefield-Varthur Road, Prestige Evergreen, forms the second phase of its Prestige Raintree Park township in East Bangalore. It adds 2,000 homes over 14 towers, due for completion on 30 June 2030 under RERA. Read on for the address, homes, prices, registration and pre-booking checks.
Address and Commute
Officially, the site belongs to Bellandur Amanikere village, in Varthur Hobli of Bengaluru East Taluk, beside Whitefield Main Road, also called SH 35, close to Varthur. On its west is Raintree Park's phase one. Storm water channels run past the site on its north and south, with Varthur Lake not far away.
Northward, the road leads to Whitefield and its offices and malls; south-west, it heads to Varthur, Gunjur and then Sarjapur Road. Varthur Road is the link to Marathahalli and on to the Outer Ring Road. Whitefield has Purple Line metro stations, yet reaching one takes a drive, so road travel is the norm.
The road tightens around the lake and old Varthur village, and peak hours bring slow traffic. Test the office drive and the run to the closest Purple Line station during weekday peaks, morning and evening. Being bordered by water channels, the site also warrants a question on monsoon drainage.
Who Should Consider It
Because plans range from 1 BHK to 4 BHK, the phase works for first homes, bigger families and anyone who needs an extra room for an elderly parent or domestic staff. Still, two bedrooms starting at Rs. 1.70 Crore point mainly to senior professionals with jobs along the Outer Ring Road or in Whitefield.
Construction is registered from 1 January 2026, so possession is over three years away. Renters will be paying both rent and EMIs till 2030. Families who must move within one or two years should look at completed projects instead.
Towers, Open Space and Plans
The registered land is 100,100 sq m, about 24.7 acres, carrying 14 towers. Each one rises 19 floors above three basements to about 64 metres and contains anywhere from 114 to 174 homes, typically six to nine per floor.
Buildings take up around 30% of the ground and 70% stays open. The registration lists 103 open and 3,154 covered parking bays. Here is the registered split of homes:
| Homes | Plan | Carpet Area Range (sq ft) |
|---|---|---|
| 1,066 | Three bedrooms | near 920 up to 1,300 |
| 418 | Two bedrooms | near 715 up to 950 |
| 334 | Four bedrooms | near 1,460 up to 1,590 |
| 182 | One bedroom | near 420 up to 590 |
Three-bedroom homes form the majority, in two-bathroom, three-bathroom and three-bathroom-plus-study versions. All four-bedroom plans add a domestic help's room. Pricing uses saleable area, bigger than carpet area since it takes in walls, balconies and part of the shared spaces.
Price List and Added Costs
The cheapest home is a two-bedroom flat and the costliest a large four-bedroom one. Starting prices by saleable size:
- Rs. 1.70 Crore and up: 2 BHK, 1,174 sq ft
- Rs. 2.12 Crore and up: 3 BHK, 1,461 sq ft
- Rs. 2.81 Crore and up: 3 BHK and study, 1,991 sq ft
- Rs. 3.21 Crore and up: 4 BHK, 2,271 sq ft
- Rs. 3.47 Crore and up: larger 4 BHK, 2,492 sq ft
Rates come to around Rs. 13,900 to 14,500 a sq ft on saleable area, and view and floor-rise premiums push them higher. Reach out to us for what is currently available in 1 BHK and at what price.
Statutory costs are charged outside the agreement price. Above Rs. 45 Lakhs, stamp duty is 5.6% inclusive of cess and surcharge; registration adds 2%. For a flat priced at Rs. 1.70 Crore, the pair totals roughly Rs. 12.9 Lakhs. GST, the maintenance deposit, club charges and parking are separate, so request one written figure covering everything.
Purely as an example: banks fund at most 75% of value when a loan tops Rs. 75 Lakhs, so paying 25% down on the Rs. 1.70 Crore flat means borrowing around Rs. 1.27 Crore. Repaid over 20 years at an 8.5% annual rate, the instalment comes near Rs. 1.11 Lakhs monthly. For any other price or term, try the EMI calculator.
What the Amenities Include
The principal rooms are finished in marble, and a large clubhouse leads the facilities. As registered, they are:
- Clubhouse: approximately 82,500 sq ft
- Swimming pool, and a 2,500 sq ft (approx.) gym
- Hall for community use
- Outdoor and indoor sports spaces
- Green parks covering about 2.5 acres
For 2,000 families, how big the clubhouse is outweighs how long the list is. Ask whether it will be ready when the first towers are handed over, and what monthly maintenance pays for.
RERA Record and Site Progress
The registration, PRM/KA/RERA/1251/446/PR/010126/008374, was issued by Karnataka RERA dated 1 January 2026. It is in favour of promoter Prestige Estates Projects Limited, for "Evergreen @ Prestige Raintree Park". The building plan got its approval dated 24 December 2025, and the contractor on record is Kalpataru Projects International.
Registered dates run from a 1 January 2026 start to a 30 June 2030 finish. The July 2026 quarterly report showed earthwork almost done and foundations in progress, with no floors built yet. Every quarterly report on the state portal gives progress for each tower.
The project appears as Prestige Raintree Park Phase 2 in some sales material. A separate registration, named Prestige Raintree Park, governs the original phase and its own towers and deadlines. Insist that the agreement shows the Evergreen number and a tower from the registered plan.
Developer Background
Founded in Bangalore and building there since 1986, Prestige Group, a listed developer, promotes this phase through its listed company, Prestige Estates Projects Limited. Completed group townships in the Whitefield and Varthur area are open to visit before committing.
Pre-Booking Checklist
With handover more than three years off, the papers need close attention:
- Compare the registration number on the agreement with the Evergreen record online
- Write down carpet area, tower and floor, and match them with the registered plan
- Request a complete cost sheet with GST, parking, floor rise, deposits and club charges
- Go through the payment plan and the compensation clause for delays
- Ask about water, since BWSSB and borewells are the registered sources
- Ask about rainwater drainage, given channels along two boundaries
- Check with two banks that home loans are approved for the project
The possession date in the agreement should be the same as the registered one, 30 June 2030. Reach out to us for the current price sheet and which flats remain in each tower.



