Fresh guidelines from NHAI (National Highways Authority of India), released on 21 September 2026, now shape how fast, access-controlled National Highways get planned and designed. They govern all four- and six-lane roads of this class still to come, whether greenfield or brownfield, while expressways fall outside them. The move supports the country's aim of building 50,000 km of high-speed, access-controlled corridors by 2047.
Why NHAI wanted a uniform template
From now on, the Detailed Project Report (DPR) of any such highway follows one standard. The authority says this brings consistent engineering, better road safety and more efficient operation across its network. Design questions that used to be answered project by project are decided while planning.
The rules at a glance
The guidelines cover the following:
- Median openings and at-grade junctions are banned, cutting out points where vehicles cross paths.
- Each exit is signposted at distances of 5 km, then 2 km, then 1 km and finally 500 metres.
- Medians are flush, with wire-rope or crash-barrier protection instead of raised concrete.
- Corridors get a 60-metre or 70-metre right of way, as projected traffic demands.
- Every plan includes room for Multi-Lane Free Flow, or MLFF, tolling.
- Embankments and pavements are laid with AI-MC, where construction is automated, intelligent and machine-aided.
- Drainage is part of the DPR itself, with rainwater outlets and water harvesting structures located in advance.
- Locally suited landscaping goes on medians, at loops and below flyovers, and medians are drip irrigated.
Traffic studies get stricter too. They must account for present and diverted flows plus expected freight growth, drawing on toll data and other trustworthy figures. Special drainage at depressed medians, underpasses and flyovers guards against waterlogging.
With MLFF, a toll is deducted as the vehicle drives on, and nobody halts at a plaza. Because the provision is designed in from the outset, new corridors can adopt barrier-free tolling without being rebuilt.
Reading highway access in a property pitch
Around Bangalore, many outlying layouts are pitched on how close they are to a highway. Sellers in Nelamangala, Devanahalli and Hoskote frequently lead with road links. Yet an access-controlled corridor admits and releases vehicles only at designed points.
So a site fronting the road cannot drive straight onto it. Buyers should weigh how far away the nearest designated entry or exit point is, and how good the feeder road to it is. Without median openings, a property on the opposite side is reachable only by the next structure that crosses the highway.
The rules apply to projects still to come. A highway now open retains its design unless NHAI upgrades it. A proposed corridor counts as planned until its alignment and land acquisition have been notified.
Five checks before booking
Land sold on the strength of a highway link calls for these checks:
- See which approach road the sanctioned layout shows, and whether that road is a service road, a private road or a village road.
- Drive the route from plot to the closest highway entry and return during rush hour.
- Ask if any portion of the plot is earmarked as right of way for a new corridor or a planned widening.
- Note how high the site is relative to the highway embankment, and where the layout's rainwater is meant to go.
- Verify RERA registration, layout approval and land conversion, the same checks as for every purchase.
What happens next
Project reports for coming four- and six-lane access-controlled corridors are being drawn to this template. A corridor's entries and exits are disclosed once its DPR is out and land acquisition is notified. Those records tell a buyer far more than a brochure map does.