MJR Divine Meadows Phase 2 at Mahalchowdenahalli, Sarjapur: Buyer's Guide (October 2026)

Villa buyers looking past the Sarjapur Road office belt now have MJR Divine Meadows Phase 2 to consider. Max Global Developers is the promoter of this launch at Mahalchowdenahalli, near Sarjapur town, with 79 villas across roughly 6.84 acres. Karnataka RERA granted registration on 23 September 2026, and this guide explains it along with the schedule, villa sizes, site plan, surroundings, costs and pre-booking checks.
Registration and Who Is Behind It
Its registration, PRM/KA/RERA/1251/308/PR/230926/008967, is dated 23 September 2026. Search the state portal for "Divine Meadows Phase 2" to see it. Building plan approval STRRPA/TP/CC/593/2025-26/914 came through on 15 July 2026.
While ads carry the MJR brand, the registered promoter is Max Global Developers, which should sign the sale agreement. The six survey numbers are owned by two landowners and come under one khata. A lawyer ought to go through the conversion orders, the khata and the joint development deal before money changes hands.
This is the firm behind Bangalore's MJR-branded launches, grouped under MJR Builders on our site. It is also the registered promoter of North Park, Satori Residence by Genurise and Divine Meadows.
Key Facts
The essentials in one place:
| Point | Detail |
|---|---|
| Total villas | 79 |
| Promoter | Max Global Developers (partnership, HSR Layout, Bangalore) |
| Structure | G + 2 villas |
| Registered project | Divine Meadows Phase 2 |
| Site | 6.84 acres approx. (27,670 sq m) |
| Sizes | 3 BHK through 5.5 BHK, including 4.5 BHK |
| Carpet | 1,732 sq ft (smallest) and 4,602 sq ft (largest), approx. |
| RERA date | 23 September 2026 |
| Finish date filed | 31 December 2031 |
Timeline, and Lessons From Phase 1
Work has a scheduled start of 30 September 2026, and RERA lists 31 December 2031 for completion. That means waiting just over five years. Structure work is pencilled in for 2028 and 2029, with finishing and landscaping across 2030 and 2031.
The first-phase neighbour, MJR Divine Meadows, offers the best proof of delivery with 137 villas across roughly 15.9 acres. It was registered 19 December 2022 and scheduled to finish by 15 August 2026. On 2 September 2026 its update reported 95% progress, the structure done and the finishing, clubhouse and amenities still under way.
Walking that phase lets a buyer judge villa finish, roads and how quickly homes are handed over. It is the most useful site visit before booking.
Villa Mix
Of 79 homes, a dominant 69 are 4.5 BHK, with four other types making up the rest. All are G + 2 with a 9.9-metre height. The breakup, with approximate carpet areas:
- 4.5 BHK, 69 units: between 1,903 and 3,469 sq ft
- 5.5 BHK, 5 units: between 2,705 and 4,602 sq ft
- 5 BHK, 2 units: one of 3,200 sq ft, one of 3,383 sq ft
- 3 BHK, 2 units: one of 1,732 sq ft, one of 1,757 sq ft
- 4 BHK, 1 unit: 1,851 sq ft
Brochures usually quote built-up area, so these carpet figures, measured inside the walls, look lower. Balcony and verandah space is listed separately and adds 500 sq ft to 1,060 sq ft per home. Size varies sharply inside one type: the biggest 4.5 BHK is nearly twice the smallest, so the allotted unit number counts for more than the BHK tag.
For the 4.5 BHK villas, land shares go from 1,960 sq ft at the low end to 3,605 sq ft at the top. There are 20 open and 154 covered parking spaces, two per villa in most cases. Request the specific villa's figures for carpet, balconies and land, taken from the unit schedule filed with RERA.
Site Plan and Common Facilities
At 79 villas on that land, density works out to some 11 to 12 homes per acre. Built footprint is 9,103 sq m and open area 18,567 sq m, around 67% of the site. FAR is sanctioned at 0.8.
Registered facilities are street lighting, parks, an STP, internal roads with footpaths, power backup and outdoor sports, with water drawn from both borewells and gram panchayat lines. Phase 2 itself has no clubhouse, gym or swimming pool planned. Secure written terms on whether its owners can enter the first phase's clubhouse.
Address and Surroundings
The land is Mahalchowdenahalli Village survey numbers 94/2A, 95/2 and 95/5 to 95/8, in Kasaba Hobli of Anekal Taluk in Bengaluru Urban (PIN 562125). Its western boundary meets a road, and Phase 1 adjoins it.
The village is on the far side of Sarjapur town from the city. Shops, schools and day-to-day services are in the town, and the ORR technology parks are a longer trip. Try the commute at peak hour before deciding.
Approval came from the Satellite Town Ring Road Planning Authority, responsible for land along the planned ring road, which is being built section by section. Value the home on existing roads and see the ring road as future upside.
Cost Planning
The developer is still settling launch pricing, so ask for an updated price list along with the full cost sheet. Since same-type villas vary so much, compare them on carpet area. A complete cost sheet lists:
- Base villa price and any corner or park-facing premium
- GST on an under-construction purchase
- For values over Rs. 45 Lakhs, a 5% duty (5.6% once cess and surcharge are added) and 2% for registration
- Utility deposits
- Corpus, advance maintenance and clubhouse fees, if applicable
Our EMI calculator shows a sample repayment at 8.5% over 20 years with 20% paid upfront. Use it before talking to lenders.
Before Paying a Deposit
With delivery set for 2031, this is a long commitment that deserves careful document checks:
- Verify on the state portal that 31 December 2031 appears as the completion date.
- Tally the sanctioned plan's villa count and height with the registration.
- Study each survey number's original conversion order and the khata.
- Obtain written figures for the villa's carpet, balconies and land share.
- Talk to Phase 1 owners about build quality and when they got possession.
- Check that the agreement for sale is signed by Max Global Developers.
- Clarify clubhouse access and monthly upkeep, which only 79 owners will share.
Before the sale agreement, no more than 10% of the price may legally be collected. After that, link each payment to a stage of work that can be inspected at the site.



