Siri Malle's Magical Springs, Devanahalli: Plot Buyer's Guide (October 2026)

Plot buyers eyeing the airport side of North Bangalore will come across Magical Springs, a 151-site layout from Siri Malle Infra Developers. Spread over about 13.9 acres near IVC Road, Devanahalli, it is filed with Karnataka RERA as "Sirikanthi Magical Springs". This guide sets out the approvals, the sites, the progress so far, the costs and the due diligence steps.
RERA Number and Approvals
Registration PRM/KA/RERA/1250/303/PR/301223/006525 dates from 30 December 2023, and the portal shows it to anyone who searches. The airport area planning body approved layout plan BIAPPA/TP/LAO/82/2022-23/2703 on 22 February 2023.
Siri Malle Infra Developers, a partnership firm with an office in Sahakara Nagar, has no earlier project on the portal. At registration it stated that the land faced no litigation, and Sri Sai Kranthi Properties is named as the landowner partner. Whoever appears in the title deeds and the registration certificate should be the signatories to the sale deed.
Snapshot of the Project
Here is the filing in brief:
| Point | Detail |
|---|---|
| RERA name | Sirikanthi Magical Springs |
| Promoter | Siri Malle Infra Developers (a Sahakara Nagar partnership) |
| Category | Plots only |
| Total land | 13.9 acres approx. (56,250 sq m) |
| Sites | 148 for housing plus 3 commercial, 151 in all |
| Residential range | 4,000 sq ft at the top, 1,200 sq ft at the smallest |
| Approving body | Bangalore International Airport Area Planning Authority (approval dated 22 February 2023) |
| Finish date filed | 31 December 2025 |
Ads link the developer to the brand in more than one form. Type the registered name into the RERA search to find the right record.
Site Dimensions
The 30 x 40 sites are the most common, and the biggest residential sites line the broadest roads. Per the RERA filing:
- 44 sites measuring 30 x 40 (1,200 sq ft)
- 17 sites measuring 30 x 50 (1,500 sq ft)
- 8 sites measuring 40 x 50 (2,000 sq ft)
- 12 sites measuring 40 x 60 (2,400 sq ft)
- A single site measuring 40 x 80 (3,200 sq ft), counted as 1
- 9 sites measuring 50 x 74 (roughly 3,700 sq ft)
- 10 sites measuring 50 x 80 (4,000 sq ft)
- 47 irregular residential sites ranging about 1,490 sq ft to 3,650 sq ft
- 3 commercial sites measuring 60 x 100 (6,000 sq ft)
Next to the commercial sites is a park, on the 13.72-metre road. Road widths inside run 15, 13.72, 12 and 9 metres, with the larger plots on the 15-metre stretch. For every plot, the RERA schedule records what adjoins each side, a quick way to rule out sites that back onto outside land.
Address and Surroundings
On paper the project occupies two villages of Kasaba Hobli: Kempathimmanahalli (Survey Nos. 22/2 and 90) and Doddapanahalli (Survey No. 59). The taluk is Devanahalli, the district Bengaluru Rural and the PIN 562110. The villages are on the highway's western flank, served by IVC Road, with Kempegowda International Airport over on the eastern side.
This pocket of Devanahalli draws interest because the airport is close, along with parks built around aerospace, hardware and logistics. Daily needs mean driving, as shops, schools and hospitals spread out along the highway and into Yelahanka and Devanahalli. Metro work on the Blue Line to the airport continues along the highway, so value the site on present roads and services.
Where Work Is, October 2026
Development got going on 15 January 2024, with 31 December 2025 as the RERA finish date. About six months early, on 23 June 2025, the promoter filed for completion and attached:
- A completion letter for the works, with the final sanctioned plan
- The release order freeing the sites
- A relinquishment deed giving up the civic amenity site, parks and roads
- Clearances for water supply and from BESCOM
- Consent from the pollution control board to operate the STP
At that point 73 sites out of 151 had found buyers, so the layout is registration-ready with stock left. Walk the layout and compare each road, drain, park and street light with the sanctioned plan.
Land Split and Facilities
The master plan breaks the land down as:
- Sites take 54% approx., 30,627 sq m
- Roads take 31% approx., 17,171 sq m
- Five park and open space parcels take 10% approx., 5,632 sq m
- Civic amenity land takes 5% approx., 2,819 sq m
The filed works are site formation, roads with footpaths, water lines, sewerage, electricity, street lighting, landscaping and an STP. The parks and CCTV coverage make up the shared facilities. Supply comes from borewells and from the village panchayat of Kannamangala.
A clubhouse, swimming pool or gym is missing from what RERA records. Any such promise needs answers on location, ownership and upkeep, set down in the sale agreement.
Budgeting the Purchase
Rates move with plot size, road width and corner or park-facing position. Ask for the live rate card for the plot chosen. Add these extras:
- For values over Rs. 45 Lakhs, 5% stamp duty, 5.6% all told once cess and surcharge are added, and a further 2% to register
- A maintenance deposit and any annual upkeep fee
- Paperwork and legal charges if the developer applies them
- Khata transfer and utility connections when construction starts
- House construction, which tends to overshoot early budgets
Duty is worked out on the sale price or the guidance value, whichever is more. Our EMI calculator models a loan over 20 years at 8.5% after a 20% down payment.
Due Diligence Steps
With the layout complete, documents and site can be verified together:
- Search "Sirikanthi Magical Springs" on the portal and tally the survey numbers, promoter name and land extent.
- Study the land conversion order, the layout sanction and the release order.
- Confirm your plot's number, area and boundaries against the sanctioned drawing.
- Obtain the plot's e-khata and check the owner name and extent.
- Secure a 30-year (or longer) encumbrance certificate and an independent legal title opinion.
- Learn the height cap for construction close to the airport before drawing up house plans.
- Get maintenance terms and promised facilities on paper.
The law caps any payment made ahead of a registered sale agreement at 10% of the price. With every paper verified, registration can go ahead safely.



