Book A HomeReal Estate Advisory

Buying at Lodha Mirabelle, Thanisandra: What to Know (October 2026)

By Book A Home Editorial Team·26 November 2026·6 min read
Lodha Mirabelle Phase 1 apartments

Adjoining Manyata Tech Park, in the north of the city, the Lodha brand is selling Lodha Mirabelle, a tall apartment development on the Thanisandra main road. Five towers hold 721 units, registered with K-RERA as two phases. This article explains who it suits, where it is, how the phases differ, home sizes, costs, building status and what to check before booking.

Who Should Consider It

The project is designed for households that want plenty of space close to the Manyata offices. The stock leans heavily towards 3 BHK and larger 4 BHK homes with an added study or staff room, and prices open near Rs. 3 Crore. Professionals based around Hebbal, Nagavara or Manyata who like a large clubhouse and high-floor living are the core buyers.

Progress differs sharply between the phases. With most homes already booked, Lodha Mirabelle Phase 1 offers limited choice despite being far ahead on site. More inventory remains in Lodha Mirabelle Phase 2, which finishes in 2030, so it works for patient buyers.

Where It Is and How to Get Around

On the registration, the address is Thanisandra village in KR Puram Hobli, with frontage on Thanisandra Main Road and pincode 560077. The road runs past the southern boundary of the plot. Nagavara adjoins the area, and the nearest big office campus is Manyata Tech Park.

Getting around relies on:

  • The main road outside, which reaches the ORR at Nagavara
  • The ORR itself, linking KR Puram, Hebbal and Hennur
  • Bellary Road via Hebbal for the airport, some 30 minutes away in light traffic
  • Two metro lines under construction, Blue and Pink, each with a planned Nagavara station

It takes about 5 minutes to reach Elements Mall, and around 20 minutes to Manipal Hospital or VIBGYOR School. The main road gets congested at rush hour, so anyone working beyond Manyata should try the weekday drive. Metro stations are not ready yet, which leaves cars as the usual option.

How the Phases Compare

The towers belong to a 19-acre residential campus where the same promoter has built earlier blocks. Mirabelle covers Towers 3 to 7, registered in two parts:

  • The first phase covers Towers 5, 6 and 7, each of 28 floors, with 437 registered units and completion due 30 June 2028
  • The second covers Towers 3 and 4, of 30 and 39 floors, with 284 homes and completion due 31 May 2030

Phase 1's total counts 88 studio units, each smaller than 175 sq ft, largely in Tower 7 beside its 4 BHK homes; excluding them leaves 349 apartments. The wider campus is planned with a central green spanning 3.2 acres plus the 45,000 sq ft Club Luxuria for fitness and leisure, offering more than 35 amenities.

Sizes on the Registration

The first phase offers 2.5 BHK through 4 BHK, and the second 2 BHK with study through 4 BHK. Carpet area figures from the registrations:

  • Phase 1 has 61 homes of 2.5 BHK, between 876 and 1,032 sq ft
  • Phase 1 has 28 homes of 3 BHK, at 996 sq ft
  • Phase 1 has 167 homes of 3.5 BHK, at 1,224 sq ft
  • Phase 1 has 87 homes of 4 BHK, between 1,451 and 1,512 sq ft
  • Phase 2 has 117 homes of 3 BHK plus study, at 1,308 sq ft
  • Phase 2 has 150 homes of 4 BHK, at 1,694 sq ft

Another 17 units in Phase 2 are 2 BHK with study, 3 BHK or 2 BHK. Saleable area on a price sheet is always higher, as it takes in walls, balconies and part of the shared areas. Use carpet area when comparing across phases or with other developments.

Prices, Taxes and Loan

Phase 1 prices begin with a 3.5 BHK for Rs. 2.99 Crore, and 4 BHK homes cost from Rs. 3.49 Crore. For Phase 2, a 3 BHK plus study begins from Rs. 3.25 Crore and a 4 BHK from Rs. 3.8 Crore. Since Phase 1 is nearly sold, floor and facing decide what each remaining unit costs, so ask the sales team for an updated price list.

Charges payable over the base price:

  • GST at 5% for homes bought while under construction
  • Stamp duty, effectively 5.6% including cess and surcharge above Rs. 45 Lakhs
  • A 2% registration charge
  • Car parking, preferred location and floor rise charges
  • Maintenance deposit, clubhouse charges and corpus

Take Rs. 2.99 Crore as an illustration: stamp duty is close to Rs. 16.7 Lakhs, while registration comes close to Rs. 6 Lakhs. Because loans over Rs. 75 Lakhs require a 25% down payment, Rs. 74.75 Lakhs is paid upfront and around Rs. 2.24 Crore is financed. At 8.5% yearly across 20 years, that EMI is close to Rs. 1.95 Lakhs per month; try other cases in the EMI calculator.

RERA Record and Construction Status

The project has two RERA numbers. The first phase, filed as "Mirabelle", holds PRM/KA/RERA/1251/309/PR/131023/006321 from 13 October 2023. The second, filed as "Mirabelle Phase 2", holds PRM/KA/RERA/1251/446/PR/230425/007688 from 23 April 2025.

Both name G Corp Homes Private Limited as promoter, with Lodha Group handling marketing. As a result, the promoter company's name appears on the sale agreement, which is worth knowing in advance. The July 2026 quarterly filings recorded:

  • Phase 1 progress at 82%, with every tower's frame complete to the top and finishing under way
  • 418 of the 437 Phase 1 units sold
  • Phase 2 progress at 7%, foundations complete and lower floors being cast
  • Bookings of 173 out of 284 Phase 2 homes

Handover in Phase 1, still being built, hinges on the occupancy certificate. In Phase 2, most of the structure is yet to come, the 39-floor tower among it. Go through each quarterly filing on K-RERA's portal before releasing money in either phase.

Points to Verify

Registrations are in place, so attention turns to the phase, tower and unit in question:

  1. Identify the registration that applies to the offered tower and unit, then check it on K-RERA's site.
  2. Compare that phase's latest quarterly filing with what is visible on site.
  3. Ask for written carpet, saleable and balcony figures for the unit.
  4. With 4 BHK units in Tower 7, confirm whether a studio comes with it and how that studio is registered.
  5. Look for the handover date, grace period and delay interest in the agreement.
  6. Get a lawyer to examine the development agreement for the land, the khata and the title.
  7. Learn which amenities, such as the clubhouse, open alongside Phase 1 and which come with Phase 2.
  8. Find out which lenders back the phase, and obtain loan sanction ahead of the booking amount.

Ask for written answers throughout. In Phase 1, request the likely occupancy certificate date; in Phase 2, link every payment to a verifiable construction milestone.

Frequently Asked Questions

What are the RERA numbers for Lodha Mirabelle?+
There are two. The first phase was granted PRM/KA/RERA/1251/309/PR/131023/006321 on 13 October 2023, and the second PRM/KA/RERA/1251/446/PR/230425/007688 on 23 April 2025. K-RERA lists both.
Where exactly is Lodha Mirabelle?+
In Thanisandra village off Thanisandra Main Road, North Bangalore, pincode 560077. Nagavara and Manyata Tech Park are right next door.
What is the possession date for Lodha Mirabelle?+
Phase 1, made up of Towers 5, 6 and 7, is registered to finish by 30 June 2028. Phase 2 (Towers 3 and 4) has a 31 May 2030 date. Phase 1 reached 82% in July 2026.
What do Lodha Mirabelle homes cost?+
Phase 1 begins with a 3.5 BHK for Rs. 2.99 Crore. In Phase 2, a 3 BHK plus study begins from Rs. 3.25 Crore. Ask the sales team for an updated list.
How many towers make up Lodha Mirabelle?+
Five. Phase 1 has three 28-floor towers, numbered 5, 6 and 7. Phase 2 has a 30-floor Tower 3 and a 39-floor Tower 4.

Related Reads